![LSIS G100 Operation Manual Download Page 27](http://html.mh-extra.com/html/lsis/g100/g100_operation-manual_1944296027.webp)
•
Do not transport the inverter by lifting with the inverter’s covers or plastic surfaces.
The inverter may tip over if covers break, causing injuries or damage to the product.
Always support the inverter using the metal frames when moving it.
•
Use a transport method that is suitable for the weight of the product. Some high
capacity inverters can be too heavy for one person to carry. Use an adequate number
of people and transport tool to safely move the product.
•
Do not install the inverter on the floor or mount it sideways against a wall. The inverter
must be installed vertically, on a wall or inside a panel, with its rear flat on the
mounting surface.
Summary of Contents for G100
Page 14: ......
Page 16: ...5 5 7 5 kW 3 Phase ...
Page 32: ...0 4 0 8 kW 1 5 2 2 kW 4 0 kW ...
Page 48: ......
Page 68: ......
Page 81: ......
Page 100: ......
Page 116: ...trips automatic Reset Restart is not attempted and the Fire Mode Count is not increased ...
Page 118: ......
Page 130: ... Terminal connections for 3 wire operation 3 wire operation ...
Page 140: ... PID control block diagram ...
Page 165: ...Code and Features Description Code Description continuous rating ...
Page 170: ......
Page 186: ... Displayed as on the Keypad ...
Page 200: ...provided signal output at 150 36 sec ...
Page 216: ...Code and Features Description delay time delay time ...
Page 219: ......
Page 237: ......
Page 253: ......
Page 295: ......
Page 314: ......
Page 335: ...Manual Revision History Revision History No Date Edition Changes 1 2019 01 First Release ...