Lockout Tagout Procedure
1-11
KVAL Operation/Service Manual
Lockout Tagout Air Supply
6.
Turn all air valves to the OFF position and place a pad-
lock through the hole (see illustration below).
NOTE:
Place your tag on the padlock, as per the
tagout guidelines.
Start Maintenance
7.
Once the locks and tags are in place and all personnel are clear, attempt to operate
the machine to ensure equipment will not operate.
8.
Maintenance or repairs may started.
Post Maintenance Steps
9.
After maintenance is completed, the person performing the work must ensure all
tools, spare parts, test equipment, etc., are completely removed and that all guards
and safety devices are installed.
10.
Before removing the locks and tags, the person who attached them shall inspect the
equipment to ensure that the machine will not be put in an unsafe condition when
re-energized.
11.
The lock and tag can now be removed (only by the person(s) who placed them),
and the machine can be re-energized.
12.
The tags must be destroyed and the locks and keys returned to the lockout center.
Summary of Contents for Edge-SS
Page 5: ...KVAL Edge SS Operation Service Manual ...
Page 12: ...KVAL Edge SS Line Operation Service Manual ...
Page 32: ...Safety Sign Off Sheet 1 20 KVAL Operation Service Manual ...
Page 35: ...Definitions 2 45 KVAL Operation Service Manual ...
Page 91: ...Definitions KVAL Operation Service Manual 2 56 ...
Page 109: ...System IT Administration 4 4 KVAL Operation Service Manual ...
Page 142: ...Collet Torque Values 5 33 KVAL Operation Service Manual ...
Page 143: ...Troubleshooting Electrical Problems 6 30 KVAL Operation Service Manual ...
Page 173: ......
Page 177: ......
Page 178: ......
Page 179: ......