Determine What:
What Subsystem is Respon-
sible for the Failed Sequence
Step
.
Analyze
the subsystem:
Check the Load.
Check the Position Feed Back.
Check the Positioning System
TABLE 6-1.
Typical KVAL Machine Sequence
Typical Machine
Sequence
Responsible Sub-
system
1. Move Door into Posi-
tion
Feed System
2. Clamp the Door
Door Clamp
3. Make the Cuts
Cutter Position-
ing Cutter Power
4. Unclamp the Door
Door Clamp
5. Move Door Out
Feed System
6. Wait for Next Door
Feed System
Basic Troubleshooting Steps
Determine Where:
The Sequence Step
Where
the Failure Occurs
What was the Machine Trying to Do?
What Was the Machine Trying to Do
Next?
Check the Sequences in the Table
Below.
How is the Broken Section Suppose to
Work?
What is Keeping the Broken Section From
Working?
What Part of the Machine is not Work-
ing?
Check the Subsystems in the Table
Below.
Ask
Narrow
Verify
Troubleshooting Basics
6-3
KVAL Operation/Service Manual
Summary of Contents for Edge-SS
Page 5: ...KVAL Edge SS Operation Service Manual ...
Page 12: ...KVAL Edge SS Line Operation Service Manual ...
Page 32: ...Safety Sign Off Sheet 1 20 KVAL Operation Service Manual ...
Page 35: ...Definitions 2 45 KVAL Operation Service Manual ...
Page 91: ...Definitions KVAL Operation Service Manual 2 56 ...
Page 109: ...System IT Administration 4 4 KVAL Operation Service Manual ...
Page 142: ...Collet Torque Values 5 33 KVAL Operation Service Manual ...
Page 143: ...Troubleshooting Electrical Problems 6 30 KVAL Operation Service Manual ...
Page 173: ......
Page 177: ......
Page 178: ......
Page 179: ......