How to Access to Bit Assemblies
5-26
KVAL Operation/Service Manual
Insert New Bit
Note:
DO NOT Bottom out Bit
If bit is bottomed out the arbor will
not tighten and could damage the
collet or other machine parts.
At Least 1/8” Clearance
3.
Lightly attach collet assembly on drill.
4.
Insert the new bit into the assembly.
5.
Before tightening the collet assembly, adjust the bit depth to the measurement taken
in step 1. Ensure there is a minimum of 1/8” clearance from the end of the bit to the
bottom of the tool holder.
6.
Tighten the collet assembly.
7.
Inspect and verify the work. Clean the work area.
Summary of Contents for Edge-SS
Page 5: ...KVAL Edge SS Operation Service Manual ...
Page 12: ...KVAL Edge SS Line Operation Service Manual ...
Page 32: ...Safety Sign Off Sheet 1 20 KVAL Operation Service Manual ...
Page 35: ...Definitions 2 45 KVAL Operation Service Manual ...
Page 91: ...Definitions KVAL Operation Service Manual 2 56 ...
Page 109: ...System IT Administration 4 4 KVAL Operation Service Manual ...
Page 142: ...Collet Torque Values 5 33 KVAL Operation Service Manual ...
Page 143: ...Troubleshooting Electrical Problems 6 30 KVAL Operation Service Manual ...
Page 173: ......
Page 177: ......
Page 178: ......
Page 179: ......