Commissioning
83
Pos: 40.39.1 /Ü berschriften/Ü berschriften 3/F-J/G/Gel enkwell e an di e M aschine montieren @ 514\mod_1504174553825_78.docx @ 3535098 @ 3 @ 1
7.5.2
Mounting the universal shaft at the machine
Pos: 40.39.2 /BA/Sicherheit/Gel enkwell e/Gefahr - Sich drehende Gel enkwelle_2 @ 0\mod_1199781692950_78.docx @ 34523 @ @ 1
Danger! - Rotating PTO shaft
Effect: Danger to life or serious injuries
• Install or detach the PTO shaft only with the engine switched off and the ignition key
removed.
• Secure the tractor against rolling.
• Make sure that the PTO shaft is coupled properly (the lock of the PTO shaft must have
snapped in).
• Make sure that the protective devices are attached properly.
• Never use a PTO shaft, the protective devices of which have not been attached.
• Replace damaged protective devices immediately
• Attach the safety chain of the PTO shaft so that the guard tube does not rotate
simultaneously with the PTO shaft.
Pos: 40.39.3 /BA/Sicherheit/Gel enkwell e/Gefahr - Antri ebsdrehzahl 540 beachten @ 3\mod_1205316518245_78.docx @ 73595 @ @ 1
Danger! -
Observe drive speed
Effect: Danger to life or serious injuries
• This machine is driven at a maximum PTO speed of 540 rpm.
Pos: 40.39.4 /BA/Inbetri ebnahme/Wender /Anbau Gel enkwelle/Hinweis M ontag e Gel enkwelle @ 20\mod_1239024536740_78.docx @ 227900 @ @ 1
Note
When mounting the universal shaft, make sure that the overload protection system will be
installed on the side of the machine.
Pos: 40.39.5 /Ü berschriften/Z wischenüberschrift en/U-Z/Vor aussetzung @ 463\mod_1466572209300_78.docx @ 3123726 @ @ 1
Prerequisite
Pos: 40.39.6 /BA/Erstinbetriebnahme/R undballenpr esse/Gel enkwelle/Gelenkwelle von Pick-up demonti ert und Schutztopf monti ert_Voraussetzung @ 514\mod_1504182327646_78.docx @ 3535859 @ @ 1
– You have dismounted the universal shaft from the pick-up and unpacked it.
– You have mounted the protective cap, see chapter Commissioning, "Mounting the
protective cap for the universal shaft of the tractor".
Pos: 40.39.7 /BA/Erstinbetriebnahme/R undballenpr esse/Gel enkwelle/Gelenkwelle an die M aschine montier en_Bild1_C ompri ma_F orti ma @ 514\mod_1504182018229_78.docx @ 3535765 @ @ 1
COM00618
1
2
Fig. 53
Pos: 40.39.8 /BA/Erstinbetriebnahme/R undballenpr esse/Gel enkwelle/Gelenkwelle an der M aschine montier en_T ext1_C omprima_Forti ma @ 514\mod_1504182802736_78.docx @ 3535890 @ @ 1
• Remove the screw connection (2) from the universal shaft (1).
Pos: 40.39.9 /Layout Module /---------------Seitenumbr uch---------------- @ 0\mod_1196175311226_0.docx @ 4165 @ @ 1