
Commissioning
71
Pos: 40.13 /BA/Erstinbetriebnahme/Rundballenpr esse/Arbeitsschritte Erstinbetriebnahme @ 32\mod_1253176922910_78.docx @ 312501 @ @ 1
KR-1-081
1
Fig. 33
• Park the machine on firm, level ground.
• Place two wheel chocks (1) under the wheels to prevent the machine from rolling away.
1
VP800016
Fig. 34
• Take the bag with the small parts (1) out of the twine box.