ENGINE EXHAUST 6F – 5
INSTALLATION
4. Front exhaust pipe.
3. Front exhaust pipe fixing bolts and nuts.
•
Tighten the fixing nuts to the specified torque
N
∙
m (kg
∙
m/lb
∙
ft)
50 (5.1/37)
2. Front exhaust pipe mounting bracket fixing bolt and nut.
•
Tighten the fixing bolt to the specified torque
N
∙
m (kg
∙
m/lb
∙
ft)
40 (4.1/30)
1. Exhaust manifold fixing nuts
•
Tighten the fixing nuts to the specified torque
N
∙
m (kg
∙
m/lb
∙
ft)
69 (7/51)
•
Connect battery ground cable.
•
After assembling each part, start the engine to check
for any leakage of gas at each connection.
Exhaust Brake Unit
INSPECTION
Operational inspection
•
With the engine idling, operate the exhaust brake to
check for the sound of the valve hitting against the
stopper.
Unit inspection
•
Check to see if the exhaust valve opens and closes
smoothly when the power chamber is
applied with a negative pressure (400 mmHg - 700
mmHg) by the vacuum pump.
•
Check to see if the clearance between the valve and
the body is in the range of 0.1 mm - 0.2 mm (the
minimum of 0.1 mm) on an average of the points “A”
and “B” when the power chamber is applied with a
negative pressure (650 mmHg - 700 mmHg) by the
vacuum pump.
When the clearance is outside this range, adjust the
clearance with the adjust bolt.
6F-7-1.tif
6F-5-2.tif
6F-5-3.tif
Summary of Contents for NHR 4J Series
Page 1: ...WORKSHOP MANUAL NHR NKR NPR ENGINE 4J SERIES SECTION 6...
Page 2: ...MEMO...
Page 58: ...00 54 SERVICE INFORMATION Cooling System and Lubrication System N m kg m lb ft...
Page 60: ...00 56 SERVICE INFORMATION N m kg m lb ft 036LX003 tif...
Page 61: ...SERVICE INFORMATION 00 57 Engine Electricals N m kg m lb ft 0056 1 tif...
Page 62: ...00 58 SERVICE INFORMATION Engine Fuel N m kg m lb ft 0057 1 tif...
Page 63: ...SERVICE INFORMATION 00 59 Engine Mounting Bracket N m kg m lb ft 0058 1 tif...
Page 67: ...SERVICE INFORMATION 00 63 MEMO...
Page 325: ...6C 66 ENGINE FUEL MEMO...
Page 333: ...6D1 8 ENGINE ELECTRICAL MEMO...
Page 335: ...6D2 2 STARTING SYSTEM STARTING CIRCUIT 6D2 2 1 tif...
Page 347: ...6D3 2 CHARGING SYSTEM Generator 6D3 2 1 tif 6D3 2 2 tif...
Page 348: ...CHARGING SYSTEM 6D3 3 CHARGING CIRCUIT 6D3 3 1 tif...
Page 367: ...6D3 22 CHARGING SYSTEM MEMO...
Page 369: ...6D6 2 QOSII PREHEATING SYSTEM SYSTEM DIAGRAM QOS II Timing Chart 6D6 2 1 tif 6D6 2 2 tif...
Page 373: ...6D6 6 QOSII PREHEATING SYSTEM MEMO...
Page 375: ...6D7 2 QOSIII PREHEATING SYSTEM SYSTEM DIAGRAM QOS II Timing Chart 6D7 2 1 tif 6D7 2 2 tif...
Page 376: ...QOSIII PREHEATING SYSTEM 6D7 3 QOS III FLOW CHART 6D7 3 1 tif...
Page 377: ...6D7 4 QOSIII PREHEATING SYSTEM QOS III BLOCK CHART 6D7 4 1 tif...
Page 381: ...6D7 8 QOSIII PREHEATING SYSTEM MEMO...
Page 387: ...6E 6 EXHAUST GAS RECIRCULATION EGR SYSTEM MEMO...
Page 393: ...6F 6 ENGINE EXHAUST MEMO...
Page 406: ...No HGSTG WE 661 PRINTED IN JAPAN...