ENGINE FUEL 6C - 23
DISASSEMBLY (4JBI/4JB1T Engine)
1. Retaining Nut
2. Injection Nozzle
1) Remove the nozzle assemblies from the nozzle
holders.
Tag the nozzle assemblies and the nozzle holders to
ensure that they are reinstalled in their original
positions.
The nozzle assembly and nozzle holder combinations
must not be interchanged.
2) Immerse the injection nozzle in a tool tray filled with
clean diesel oil to protect them from dust.
3. Spacer
4. Spring Seat
5. Spring
6. Adjusting Shim
7. Nozzle Holder
INSPECTION AND REPAIR (4JB1/4JB1 T
Engine)
Make the necessary adjustments, repairs, and part
replacements if excessive wear or damage is discovered
during inspection.
Inspection Nozzle Needle Inspection
1. Remove the needle from the nozzle body.
2. Carefully wash the nozzle needle and the nozzle body
in clean diesel fuel.
3. Check that the nozzle needle moves smoothly inside
the injection nozzle body.
If the nozzle needle does not move smoothly, it must
be repaired (See "Nozzle Lapping Procedure" belows).
6C-22-1.tif
6C-22-2.tif
6C-22-3.tif
Summary of Contents for NHR 4J Series
Page 1: ...WORKSHOP MANUAL NHR NKR NPR ENGINE 4J SERIES SECTION 6...
Page 2: ...MEMO...
Page 58: ...00 54 SERVICE INFORMATION Cooling System and Lubrication System N m kg m lb ft...
Page 60: ...00 56 SERVICE INFORMATION N m kg m lb ft 036LX003 tif...
Page 61: ...SERVICE INFORMATION 00 57 Engine Electricals N m kg m lb ft 0056 1 tif...
Page 62: ...00 58 SERVICE INFORMATION Engine Fuel N m kg m lb ft 0057 1 tif...
Page 63: ...SERVICE INFORMATION 00 59 Engine Mounting Bracket N m kg m lb ft 0058 1 tif...
Page 67: ...SERVICE INFORMATION 00 63 MEMO...
Page 325: ...6C 66 ENGINE FUEL MEMO...
Page 333: ...6D1 8 ENGINE ELECTRICAL MEMO...
Page 335: ...6D2 2 STARTING SYSTEM STARTING CIRCUIT 6D2 2 1 tif...
Page 347: ...6D3 2 CHARGING SYSTEM Generator 6D3 2 1 tif 6D3 2 2 tif...
Page 348: ...CHARGING SYSTEM 6D3 3 CHARGING CIRCUIT 6D3 3 1 tif...
Page 367: ...6D3 22 CHARGING SYSTEM MEMO...
Page 369: ...6D6 2 QOSII PREHEATING SYSTEM SYSTEM DIAGRAM QOS II Timing Chart 6D6 2 1 tif 6D6 2 2 tif...
Page 373: ...6D6 6 QOSII PREHEATING SYSTEM MEMO...
Page 375: ...6D7 2 QOSIII PREHEATING SYSTEM SYSTEM DIAGRAM QOS II Timing Chart 6D7 2 1 tif 6D7 2 2 tif...
Page 376: ...QOSIII PREHEATING SYSTEM 6D7 3 QOS III FLOW CHART 6D7 3 1 tif...
Page 377: ...6D7 4 QOSIII PREHEATING SYSTEM QOS III BLOCK CHART 6D7 4 1 tif...
Page 381: ...6D7 8 QOSIII PREHEATING SYSTEM MEMO...
Page 387: ...6E 6 EXHAUST GAS RECIRCULATION EGR SYSTEM MEMO...
Page 393: ...6F 6 ENGINE EXHAUST MEMO...
Page 406: ...No HGSTG WE 661 PRINTED IN JAPAN...