6A1 – 42 4JB1/4JB1T/4JB1TC/4JG2 - ENGINE
4JG2 Cylinder Head Gasket Thickness
mm (in)
Gasket Grade Mark
Piston
Projection
Gasket Thickness
(Reference)
A
0.658 - 0.713
(0.026 - 0.028)
1.60
(0.0630)
B
0.713 - 0.759
(0.028 - 0.030)
1.65
(0.0650)
C
0.759 - 0.814
(0.030 - 0.032)
1.70
(0.0670)
NOTE:
The difference between the highest measured piston
head projection and the lowest measured piston head
projection must not exceed 1.0 mm (0.039 in).
19. Cylinder Head Assembly
1) Install the dowel in cylinder block.
2) Install the cylinder head gasket with top mark up.
3) Clean up cylinder head lower surface and cylinder
body upper surface.
4) Install the cylinder head as softly.
5) Apply engine oil to screw and seat of cylinder head
bolts.
6) Tighten the cylinder head bolts to the specified torque
in three steps following the numerical order shown in
the illustration.
Cylinder Head bolts Torque
N
∙
m (kg
∙
m/lb
∙
ft)
1st Step
2nd Step
3rd Step
49 (5.0/36)
60 - 75°
60 - 75°
18. Push Rod
•
Apply engine oil to push rod and in to the cylinder
head.
17. Rocker Arm shaft
1) Loosen all adjusting screws.
2) Position the rocker arm shaft with the large oil hole
(4ø) facing the front of the engine.
6A1-42-1.tif
6A1-42-2.tif
6A1-42-3.tif
Summary of Contents for NHR 4J Series
Page 1: ...WORKSHOP MANUAL NHR NKR NPR ENGINE 4J SERIES SECTION 6...
Page 2: ...MEMO...
Page 58: ...00 54 SERVICE INFORMATION Cooling System and Lubrication System N m kg m lb ft...
Page 60: ...00 56 SERVICE INFORMATION N m kg m lb ft 036LX003 tif...
Page 61: ...SERVICE INFORMATION 00 57 Engine Electricals N m kg m lb ft 0056 1 tif...
Page 62: ...00 58 SERVICE INFORMATION Engine Fuel N m kg m lb ft 0057 1 tif...
Page 63: ...SERVICE INFORMATION 00 59 Engine Mounting Bracket N m kg m lb ft 0058 1 tif...
Page 67: ...SERVICE INFORMATION 00 63 MEMO...
Page 325: ...6C 66 ENGINE FUEL MEMO...
Page 333: ...6D1 8 ENGINE ELECTRICAL MEMO...
Page 335: ...6D2 2 STARTING SYSTEM STARTING CIRCUIT 6D2 2 1 tif...
Page 347: ...6D3 2 CHARGING SYSTEM Generator 6D3 2 1 tif 6D3 2 2 tif...
Page 348: ...CHARGING SYSTEM 6D3 3 CHARGING CIRCUIT 6D3 3 1 tif...
Page 367: ...6D3 22 CHARGING SYSTEM MEMO...
Page 369: ...6D6 2 QOSII PREHEATING SYSTEM SYSTEM DIAGRAM QOS II Timing Chart 6D6 2 1 tif 6D6 2 2 tif...
Page 373: ...6D6 6 QOSII PREHEATING SYSTEM MEMO...
Page 375: ...6D7 2 QOSIII PREHEATING SYSTEM SYSTEM DIAGRAM QOS II Timing Chart 6D7 2 1 tif 6D7 2 2 tif...
Page 376: ...QOSIII PREHEATING SYSTEM 6D7 3 QOS III FLOW CHART 6D7 3 1 tif...
Page 377: ...6D7 4 QOSIII PREHEATING SYSTEM QOS III BLOCK CHART 6D7 4 1 tif...
Page 381: ...6D7 8 QOSIII PREHEATING SYSTEM MEMO...
Page 387: ...6E 6 EXHAUST GAS RECIRCULATION EGR SYSTEM MEMO...
Page 393: ...6F 6 ENGINE EXHAUST MEMO...
Page 406: ...No HGSTG WE 661 PRINTED IN JAPAN...