CHARGING SYSTEM 6D3 – 11
ROTOR
1. Check the rotor slip ring surfaces for contamination and
roughness. If rough, polish with #500-600 sandpaper.
2. Measure the slip ring diameter, and replace if it
exceeds the limit.
mm (in)
Standard
Limit
34.6 (1.36)
33.6 (1.32)
3. Check for continuity between slip rings, and replace if
there is no continuity.
4. Check for continuity between slip ring and rotor core or
slip ring and rotor shaft.
In case of continuity, replace the rotor assembly.
Rear Ball Bearing
Check to see if the ball bearing rotates smoothly with no
noises.
When it does not rotate smoothly or any noises are heard,
replace it with a new one.
When installing the bearing, press it in with the stopper ring
turned to the spline side, while pushing the bearing inner ring.
Bearing press-in measurement: L
mm (in)
Standard
41.8 - 42.0 (1.64 - 1.65)
STATOR COIL
1. Check for continuity between respective phases.
In case of no continuity, replace the stator.
6D3-11-1.tif
6D3-11-2.tif
6D3-11-3.tif
6D3-11-4.tif
6D3-11-5.tif
Summary of Contents for NHR 4J Series
Page 1: ...WORKSHOP MANUAL NHR NKR NPR ENGINE 4J SERIES SECTION 6...
Page 2: ...MEMO...
Page 58: ...00 54 SERVICE INFORMATION Cooling System and Lubrication System N m kg m lb ft...
Page 60: ...00 56 SERVICE INFORMATION N m kg m lb ft 036LX003 tif...
Page 61: ...SERVICE INFORMATION 00 57 Engine Electricals N m kg m lb ft 0056 1 tif...
Page 62: ...00 58 SERVICE INFORMATION Engine Fuel N m kg m lb ft 0057 1 tif...
Page 63: ...SERVICE INFORMATION 00 59 Engine Mounting Bracket N m kg m lb ft 0058 1 tif...
Page 67: ...SERVICE INFORMATION 00 63 MEMO...
Page 325: ...6C 66 ENGINE FUEL MEMO...
Page 333: ...6D1 8 ENGINE ELECTRICAL MEMO...
Page 335: ...6D2 2 STARTING SYSTEM STARTING CIRCUIT 6D2 2 1 tif...
Page 347: ...6D3 2 CHARGING SYSTEM Generator 6D3 2 1 tif 6D3 2 2 tif...
Page 348: ...CHARGING SYSTEM 6D3 3 CHARGING CIRCUIT 6D3 3 1 tif...
Page 367: ...6D3 22 CHARGING SYSTEM MEMO...
Page 369: ...6D6 2 QOSII PREHEATING SYSTEM SYSTEM DIAGRAM QOS II Timing Chart 6D6 2 1 tif 6D6 2 2 tif...
Page 373: ...6D6 6 QOSII PREHEATING SYSTEM MEMO...
Page 375: ...6D7 2 QOSIII PREHEATING SYSTEM SYSTEM DIAGRAM QOS II Timing Chart 6D7 2 1 tif 6D7 2 2 tif...
Page 376: ...QOSIII PREHEATING SYSTEM 6D7 3 QOS III FLOW CHART 6D7 3 1 tif...
Page 377: ...6D7 4 QOSIII PREHEATING SYSTEM QOS III BLOCK CHART 6D7 4 1 tif...
Page 381: ...6D7 8 QOSIII PREHEATING SYSTEM MEMO...
Page 387: ...6E 6 EXHAUST GAS RECIRCULATION EGR SYSTEM MEMO...
Page 393: ...6F 6 ENGINE EXHAUST MEMO...
Page 406: ...No HGSTG WE 661 PRINTED IN JAPAN...