6A – 40
GENERAL ENGINE MECHANICAL
4) After pressing in the oil seal, check the measurement
of the oil seal.
Standard
mm (in)
0.6 - 1.2 (0.024 - 0.047)
3a. Timing Belt and Pulley (Belt Drive Model)
7) Camshaft Timing Pulley
•
Apply engine oil to the oil seal lip portion of the oil seal
retainer.
•
Apply the recommended liquid gasket or its equivalent
to the retainer.
•
Install the oil seal retainer to the cylinder body.
•
Tighten the retainer bolts to the specified torque.
Oil Seal Retainer Bolt Torque
N
∙
m (kg
∙
m/lb
∙
ft)
19 (1.9/14)
•
Align the camshaft timing pulley center with the
camshaft key.
•
Tighten the timing pulley bolts to the specified torque.
Timing Pulley Bolt Torque
N
∙
m (kg
∙
m/lb
∙
in)
8 (0.8/69)
•
Prevent the camshaft from turning when tightening the
timing center bolt.
•
Tighten the timing pulley center bolt to the specified
torque.
Center Bolt Torque
N
∙
m (kg
∙
m/lb
∙
ft)
64 (6.5/47)
•
Install the crank pulley.
•
Install the idle pulley and idler pulley.
N
∙
m (kg
∙
m/lb
∙
ft)
76 (7.8/56)
•
Install the injection pump assembly and install timing
pulley.
•
Align the timing pulley with the pump shaft key.
•
Install the stopper bolt to the timing pulley.
This will prevent the timing pulley from moving.
•
Tighten the timing pulley nut to the specified torque.
Injection Pump Timing Pulley Nut Torque
N
∙
m (kg
∙
m/lb
∙
ft)
64 (6.5/47)
•
Remove the stopper bolt from the injection timing.
6A-40-1.tif
6A-40-2.tif
6A-40-3.tif
6A-40-4.tif
Summary of Contents for NHR 4J Series
Page 1: ...WORKSHOP MANUAL NHR NKR NPR ENGINE 4J SERIES SECTION 6...
Page 2: ...MEMO...
Page 58: ...00 54 SERVICE INFORMATION Cooling System and Lubrication System N m kg m lb ft...
Page 60: ...00 56 SERVICE INFORMATION N m kg m lb ft 036LX003 tif...
Page 61: ...SERVICE INFORMATION 00 57 Engine Electricals N m kg m lb ft 0056 1 tif...
Page 62: ...00 58 SERVICE INFORMATION Engine Fuel N m kg m lb ft 0057 1 tif...
Page 63: ...SERVICE INFORMATION 00 59 Engine Mounting Bracket N m kg m lb ft 0058 1 tif...
Page 67: ...SERVICE INFORMATION 00 63 MEMO...
Page 325: ...6C 66 ENGINE FUEL MEMO...
Page 333: ...6D1 8 ENGINE ELECTRICAL MEMO...
Page 335: ...6D2 2 STARTING SYSTEM STARTING CIRCUIT 6D2 2 1 tif...
Page 347: ...6D3 2 CHARGING SYSTEM Generator 6D3 2 1 tif 6D3 2 2 tif...
Page 348: ...CHARGING SYSTEM 6D3 3 CHARGING CIRCUIT 6D3 3 1 tif...
Page 367: ...6D3 22 CHARGING SYSTEM MEMO...
Page 369: ...6D6 2 QOSII PREHEATING SYSTEM SYSTEM DIAGRAM QOS II Timing Chart 6D6 2 1 tif 6D6 2 2 tif...
Page 373: ...6D6 6 QOSII PREHEATING SYSTEM MEMO...
Page 375: ...6D7 2 QOSIII PREHEATING SYSTEM SYSTEM DIAGRAM QOS II Timing Chart 6D7 2 1 tif 6D7 2 2 tif...
Page 376: ...QOSIII PREHEATING SYSTEM 6D7 3 QOS III FLOW CHART 6D7 3 1 tif...
Page 377: ...6D7 4 QOSIII PREHEATING SYSTEM QOS III BLOCK CHART 6D7 4 1 tif...
Page 381: ...6D7 8 QOSIII PREHEATING SYSTEM MEMO...
Page 387: ...6E 6 EXHAUST GAS RECIRCULATION EGR SYSTEM MEMO...
Page 393: ...6F 6 ENGINE EXHAUST MEMO...
Page 406: ...No HGSTG WE 661 PRINTED IN JAPAN...