6C - 12 ENGINE FUEL
•
Install retaining nut and tighten nut to the specified
torque.
N
∙
m (Kg
∙
m/lb
∙
ft)
39 (4.0/32)
ADJUSTMENT OF INJECTION OPENING
PRESSURE (4JG2 Engine)
•
Set nozzle holder assembly on a nozzle tester.
•
Apply hydraulic pressure by operating tester handle,
and make sure fuel cam be injected under the
following pressure.
Kpa (Kg/cm
2
/psi)
14,710 (150/2,133)
CAUTION
•
If not injected under the specified pressure, adjust with
adjusting shim.
Ref.
Types are available in the 1.0 mm - 1.75 mm
thickness range (on a 0.01 mm basis).
•
Unless extremely deformed spray in seen, there is no
problem.
CAUTION
•
The spray condition, when judged with a nozzle tester,
is deemed as normal so long as the spray form is not
excessively deformed.
Oil tight test (4JG2 Engine)
1) After completion of the adjustment of injection
pressure, wipe off light oil at the tip of the nozzle with
waste.
2) With pressure 1,961 Kpa (20 kg/cm
2
/284 psi) less than
the specified injection pressure applied, check to see if
an oil drop trickles off the tip of the nozzle within 10
seconds after application of pressure. (There is no
problem with the nozzle when oil gathers at the tip, but
does not drop off.)
3) When an oil drop trickles, clean the nozzle thoroughly.
Then reassemble it to check for any dropping of oil.
When oil still drops, change it with a new one.
6C-11-1.tif
6C-11-2.tif
6C-11-3.tif
6C-11-4.tif
Summary of Contents for NHR 4J Series
Page 1: ...WORKSHOP MANUAL NHR NKR NPR ENGINE 4J SERIES SECTION 6...
Page 2: ...MEMO...
Page 58: ...00 54 SERVICE INFORMATION Cooling System and Lubrication System N m kg m lb ft...
Page 60: ...00 56 SERVICE INFORMATION N m kg m lb ft 036LX003 tif...
Page 61: ...SERVICE INFORMATION 00 57 Engine Electricals N m kg m lb ft 0056 1 tif...
Page 62: ...00 58 SERVICE INFORMATION Engine Fuel N m kg m lb ft 0057 1 tif...
Page 63: ...SERVICE INFORMATION 00 59 Engine Mounting Bracket N m kg m lb ft 0058 1 tif...
Page 67: ...SERVICE INFORMATION 00 63 MEMO...
Page 325: ...6C 66 ENGINE FUEL MEMO...
Page 333: ...6D1 8 ENGINE ELECTRICAL MEMO...
Page 335: ...6D2 2 STARTING SYSTEM STARTING CIRCUIT 6D2 2 1 tif...
Page 347: ...6D3 2 CHARGING SYSTEM Generator 6D3 2 1 tif 6D3 2 2 tif...
Page 348: ...CHARGING SYSTEM 6D3 3 CHARGING CIRCUIT 6D3 3 1 tif...
Page 367: ...6D3 22 CHARGING SYSTEM MEMO...
Page 369: ...6D6 2 QOSII PREHEATING SYSTEM SYSTEM DIAGRAM QOS II Timing Chart 6D6 2 1 tif 6D6 2 2 tif...
Page 373: ...6D6 6 QOSII PREHEATING SYSTEM MEMO...
Page 375: ...6D7 2 QOSIII PREHEATING SYSTEM SYSTEM DIAGRAM QOS II Timing Chart 6D7 2 1 tif 6D7 2 2 tif...
Page 376: ...QOSIII PREHEATING SYSTEM 6D7 3 QOS III FLOW CHART 6D7 3 1 tif...
Page 377: ...6D7 4 QOSIII PREHEATING SYSTEM QOS III BLOCK CHART 6D7 4 1 tif...
Page 381: ...6D7 8 QOSIII PREHEATING SYSTEM MEMO...
Page 387: ...6E 6 EXHAUST GAS RECIRCULATION EGR SYSTEM MEMO...
Page 393: ...6F 6 ENGINE EXHAUST MEMO...
Page 406: ...No HGSTG WE 661 PRINTED IN JAPAN...