ENGINE FUEL 6C - 13
INSTALLATION (4JG2 Engine)
CAUTION
•
Nozzle and assembling should be as illustrated.
•
Use new heat shield and new corrugated washer.
3. Injection Nozzle (4JG2 only)
•
Lightly tighten the holder nut to suck extent that the
nozzle holder can turn one word and one word.
•
Set positioning confirmation drilled hole (
φ
2) within a
nozzle turning angle of ±5° against the cylinder head-
side positioning boss.
•
Apply a wrench as illustrated and tighten the holder nut
to the specified torque using a special tool.
CAUTION
•
After tightening the holder nut, make sure that the
drilled hole makes ±5° or smaller with the cylinder
head-side positioning boss.
•
When mounting leak off pipe, injection nozzle and
pipe, clean then with air so that dust may not
enter.
Nozzle Fixing Torque
N
∙
m (Kg
∙
m/lb
∙
ft)
64 (6.5/47)
Wrench: nozzle holder 5-8840-0259-0
2. Leak Off Pipe
•
Mount using a new copper washer
•
Tighten nut to the specified torque.
Pipe Nut Torque
N
∙
m (Kg
∙
m/lb
∙
ft)
29 (3.0/22)
1. Injection Pipe
•
Connect injection pipe to nozzle holder.
•
Tighten the injection pump side.
Sleeve Nut Torque
N
∙
m (Kg
∙
m/lb
∙
ft)
29 (3.0/22)
•
Fit pipe clip in specified position.
6C-12-1.tif
6C-12-3.tif
040LX016.tif
Summary of Contents for NHR 4J Series
Page 1: ...WORKSHOP MANUAL NHR NKR NPR ENGINE 4J SERIES SECTION 6...
Page 2: ...MEMO...
Page 58: ...00 54 SERVICE INFORMATION Cooling System and Lubrication System N m kg m lb ft...
Page 60: ...00 56 SERVICE INFORMATION N m kg m lb ft 036LX003 tif...
Page 61: ...SERVICE INFORMATION 00 57 Engine Electricals N m kg m lb ft 0056 1 tif...
Page 62: ...00 58 SERVICE INFORMATION Engine Fuel N m kg m lb ft 0057 1 tif...
Page 63: ...SERVICE INFORMATION 00 59 Engine Mounting Bracket N m kg m lb ft 0058 1 tif...
Page 67: ...SERVICE INFORMATION 00 63 MEMO...
Page 325: ...6C 66 ENGINE FUEL MEMO...
Page 333: ...6D1 8 ENGINE ELECTRICAL MEMO...
Page 335: ...6D2 2 STARTING SYSTEM STARTING CIRCUIT 6D2 2 1 tif...
Page 347: ...6D3 2 CHARGING SYSTEM Generator 6D3 2 1 tif 6D3 2 2 tif...
Page 348: ...CHARGING SYSTEM 6D3 3 CHARGING CIRCUIT 6D3 3 1 tif...
Page 367: ...6D3 22 CHARGING SYSTEM MEMO...
Page 369: ...6D6 2 QOSII PREHEATING SYSTEM SYSTEM DIAGRAM QOS II Timing Chart 6D6 2 1 tif 6D6 2 2 tif...
Page 373: ...6D6 6 QOSII PREHEATING SYSTEM MEMO...
Page 375: ...6D7 2 QOSIII PREHEATING SYSTEM SYSTEM DIAGRAM QOS II Timing Chart 6D7 2 1 tif 6D7 2 2 tif...
Page 376: ...QOSIII PREHEATING SYSTEM 6D7 3 QOS III FLOW CHART 6D7 3 1 tif...
Page 377: ...6D7 4 QOSIII PREHEATING SYSTEM QOS III BLOCK CHART 6D7 4 1 tif...
Page 381: ...6D7 8 QOSIII PREHEATING SYSTEM MEMO...
Page 387: ...6E 6 EXHAUST GAS RECIRCULATION EGR SYSTEM MEMO...
Page 393: ...6F 6 ENGINE EXHAUST MEMO...
Page 406: ...No HGSTG WE 661 PRINTED IN JAPAN...