6A – 52
GENERAL ENGINE MECHANICAL
Bushing replacement
Removal:
Use a suitable bar and bench press or
hammer.
Installation: Use a suitable bar and bench press.
NOTE:
Align the bushing with the connecting rod oil port.
After installing a new bushing, finish the bushing bore
with a pin hole grinder.
Connecting rods
1. Check the connecting rod alignment with a connecting
rod aligner.
If either the bend or the twist exceeds the specified
limit, the connecting rod must be replaced.
mm (in)
Standard
Limit
Bend per 100 (3.94) 0.08 (0.0031) or less 0.20 (0.0079)
Twist per 100 (3.94) 0.05 (0.0020) or less 0.15 (0.0059)
2. Measure the connecting rod thrust clearance.
Use a feeler gauge to measure the thrust clearance at
the big end of the connecting rod.
If the clearance exceeds the specified limit, the
connecting rod must be replaced.
Thrust Clearance
mm (in)
Standard
Limit
0.230 (0.0091)
0.350 (0.0138)
3. Measure the oil clearance between the connecting rod
and the crankshaft by:
1) Remove the connecting rod cap nuts and the rod
caps.
Arrange the removed rod caps in the cylinder
number order.
2) Clean the rod bearings and the crankshaft pins.
3) Carefully check the rod bearings.
If even one bearing is found to be damaged or
badly worn, the entire bearing assembly must be
replaced as a set. Reinstall the bearings in their
original positions.
Apply plastigage to the crank pin.
4) Reinstall the rod caps to their original positions
6A-52-1.tif
6A-52-2.tif
6A-52-3.tif
6A-52-4.tif
Summary of Contents for NHR 4J Series
Page 1: ...WORKSHOP MANUAL NHR NKR NPR ENGINE 4J SERIES SECTION 6...
Page 2: ...MEMO...
Page 58: ...00 54 SERVICE INFORMATION Cooling System and Lubrication System N m kg m lb ft...
Page 60: ...00 56 SERVICE INFORMATION N m kg m lb ft 036LX003 tif...
Page 61: ...SERVICE INFORMATION 00 57 Engine Electricals N m kg m lb ft 0056 1 tif...
Page 62: ...00 58 SERVICE INFORMATION Engine Fuel N m kg m lb ft 0057 1 tif...
Page 63: ...SERVICE INFORMATION 00 59 Engine Mounting Bracket N m kg m lb ft 0058 1 tif...
Page 67: ...SERVICE INFORMATION 00 63 MEMO...
Page 325: ...6C 66 ENGINE FUEL MEMO...
Page 333: ...6D1 8 ENGINE ELECTRICAL MEMO...
Page 335: ...6D2 2 STARTING SYSTEM STARTING CIRCUIT 6D2 2 1 tif...
Page 347: ...6D3 2 CHARGING SYSTEM Generator 6D3 2 1 tif 6D3 2 2 tif...
Page 348: ...CHARGING SYSTEM 6D3 3 CHARGING CIRCUIT 6D3 3 1 tif...
Page 367: ...6D3 22 CHARGING SYSTEM MEMO...
Page 369: ...6D6 2 QOSII PREHEATING SYSTEM SYSTEM DIAGRAM QOS II Timing Chart 6D6 2 1 tif 6D6 2 2 tif...
Page 373: ...6D6 6 QOSII PREHEATING SYSTEM MEMO...
Page 375: ...6D7 2 QOSIII PREHEATING SYSTEM SYSTEM DIAGRAM QOS II Timing Chart 6D7 2 1 tif 6D7 2 2 tif...
Page 376: ...QOSIII PREHEATING SYSTEM 6D7 3 QOS III FLOW CHART 6D7 3 1 tif...
Page 377: ...6D7 4 QOSIII PREHEATING SYSTEM QOS III BLOCK CHART 6D7 4 1 tif...
Page 381: ...6D7 8 QOSIII PREHEATING SYSTEM MEMO...
Page 387: ...6E 6 EXHAUST GAS RECIRCULATION EGR SYSTEM MEMO...
Page 393: ...6F 6 ENGINE EXHAUST MEMO...
Page 406: ...No HGSTG WE 661 PRINTED IN JAPAN...