Intel® Server System M50FCP1UR System Integration and Service Guide
32
Note:
A non-skid surface or a stop behind the server system may be needed to prevent the server system
from sliding on the work surface.
Figure 25. System Cover Removal
For each top cover panel:
1.
While pushing down on both the left and right buttons of the given top panel (See Letter A), slide the
top cover panel towards the front (front panel) or back (back panel) of the chassis. See Letter B.
2.
Carefully lift the top cover panel up and away from the chassis.
Note:
Each top cover panel can slide along the chassis base for 10 mm and then needs to be lifted.
3.1.2
System Cover Installation
Figure 26. System Cover Installation
For each top cover panel:
1.
Carefully align and set the top cover panel on top of the chassis. Then, slide it inwards until it locks
into place. See Letter A.
Shipping Note:
When transporting the server system, Intel recommends installing the four top cover screws
before shipping.
Summary of Contents for M50FCP1UR
Page 2: ...2 This page intentionally left blank...
Page 118: ...Intel Server System M50FCP1UR System Integration and Service Guide 118 1 2 3 4 5 6 1 2 3...
Page 119: ...Intel Server System M50FCP1UR System Integration and Service Guide 119 1 2 3 4 5...
Page 120: ...Intel Server System M50FCP1UR System Integration and Service Guide 120 7 8 9 10 11 12 4 5 6...
Page 121: ...Intel Server System M50FCP1UR System Integration and Service Guide 121 6 7 8 9 10...
Page 130: ...Intel Server System M50FCP1UR System Integration and Service Guide 130 1 2 3 4 5 ESD 6 1 2 3...