Intel® Server System M50FCP1UR System Integration and Service Guide
74
18.
Reinstall the system top cover (see Section 6.1.2).
Note
: To transport a fully integrated system, Intel highly recommends the system include four shipping
screws (not included) installed to the system back panel (see
). These screws provide the chassis
with additional support by reducing possible chassis flex and minimizing possible sag of the base plate.
Installed screws should meet the following specifications: flat head, 6–32 thread, 3.75 mm length
Figure 97. Back Panel Shipping Screw Locations
Summary of Contents for M50FCP1UR
Page 2: ...2 This page intentionally left blank...
Page 118: ...Intel Server System M50FCP1UR System Integration and Service Guide 118 1 2 3 4 5 6 1 2 3...
Page 119: ...Intel Server System M50FCP1UR System Integration and Service Guide 119 1 2 3 4 5...
Page 120: ...Intel Server System M50FCP1UR System Integration and Service Guide 120 7 8 9 10 11 12 4 5 6...
Page 121: ...Intel Server System M50FCP1UR System Integration and Service Guide 121 6 7 8 9 10...
Page 130: ...Intel Server System M50FCP1UR System Integration and Service Guide 130 1 2 3 4 5 ESD 6 1 2 3...
Page 131: ...Intel Server System M50FCP1UR System Integration and Service Guide 131 1 2 3 4 5...