Intel® Server System M50FCP1UR System Integration and Service Guide
114
2.
Place the front cushion (iPN K65031-001) on the left end of the inner box. Place the rear cushion
(K65006-001) on the right end of the inner box. Then, place bottom foam K75566-001 in the middle. See
the following figure.
3.
Pack the server system with red EPE sheet (iPN K58342-001). See the following figure.
4.
Pack the system wrapped with EPE sheet in the EPE bag. Then, place the system on the bottom foam (see
the following figure). Place the top front foam (iPN K65046-001) on the left and the top rear foam
(iPN K65037-001) on the right.
K65031
-001
K65006
-001
K65046
-001
K65037
-001
Summary of Contents for M50FCP1UR
Page 2: ...2 This page intentionally left blank...
Page 118: ...Intel Server System M50FCP1UR System Integration and Service Guide 118 1 2 3 4 5 6 1 2 3...
Page 119: ...Intel Server System M50FCP1UR System Integration and Service Guide 119 1 2 3 4 5...
Page 120: ...Intel Server System M50FCP1UR System Integration and Service Guide 120 7 8 9 10 11 12 4 5 6...
Page 121: ...Intel Server System M50FCP1UR System Integration and Service Guide 121 6 7 8 9 10...
Page 130: ...Intel Server System M50FCP1UR System Integration and Service Guide 130 1 2 3 4 5 ESD 6 1 2 3...
Page 131: ...Intel Server System M50FCP1UR System Integration and Service Guide 131 1 2 3 4 5...