Intel® Server System M50FCP1UR System Integration and Service Guide
6
Caution:
Slide / Rail mounted equipment is not to be used as a shelf or a workspace.
Intel warranties that this product performs to its published specifications. However, all computer systems are
inherently subject to unpredictable system behavior under various environmental and other conditions.
This product is not intended to be the sole source for any critical data, and the user must maintain a verified
backup. Failure to do so, or to comply with other user notices in the product user guide and specification
documents, may result in loss of or access to data.
Weight of the system:
•
Due to the weight of a system, Intel recommends carrying the system with two people supporting the
system from the sides or using a mechanical lift or a cart when moving the system from one location
to another.
•
If your system has rack handles installed, do not lift or carry the system by the rack handles
•
When lifting or moving a chassis, always grasp it by all four corners. Do not grasp the chassis by two
points at opposing diagonal corners, doing so may damage the internal components.
•
If you can only grasp the chassis at two different points, always grasp the chassis by the sides at the
midpoint.
Summary of Contents for M50FCP1UR
Page 2: ...2 This page intentionally left blank...
Page 118: ...Intel Server System M50FCP1UR System Integration and Service Guide 118 1 2 3 4 5 6 1 2 3...
Page 119: ...Intel Server System M50FCP1UR System Integration and Service Guide 119 1 2 3 4 5...
Page 120: ...Intel Server System M50FCP1UR System Integration and Service Guide 120 7 8 9 10 11 12 4 5 6...
Page 121: ...Intel Server System M50FCP1UR System Integration and Service Guide 121 6 7 8 9 10...
Page 130: ...Intel Server System M50FCP1UR System Integration and Service Guide 130 1 2 3 4 5 ESD 6 1 2 3...
Page 131: ...Intel Server System M50FCP1UR System Integration and Service Guide 131 1 2 3 4 5...