Minifors 2 - Benchtop Bioreactor
Installation and Initial Operation
07 February 2019
Page
69
of
214
2.
Insert the other plug into the socket on the motor.
Depending on the size of the culture vessel, the large (left-
hand) or small (right-hand) motor is supplied.
7.5 Test Run
In order to become familiar with the basic functions of the equip-
ment before the first cultivation, a short test run can be executed.
The test run comprises:
Temperature control (cooling / heating)
Stirring
Gassing
Compressed air of the stated quality (see chapter “Gas Supply”) is
used for gassing.
To avoid calcium deposits, demineralised water is recommended
for filling the vessel.
The following description of the test run does not detail handling of
individual components, e.g. exit gas cooler, stirrer, sparger etc. De-
tailed descriptions of their handling are given in the corresponding
chapters of the main chapter “Before Cultivation”.
For details on operation, see the main chapter “Operation”.
7.5.1 Preparation Test Run
Before starting the test run, check and ensure the following:
the equipment is correctly connected to the water, power and
gas supply and is operational
the motor cable is connected to the basic unit and the motor.
The following work is to be executed before the test run:
Procedure
1.
Remove the vessel top plate and put it aside carefully.