Minifors 2 - Benchtop Bioreactor
Installation and Initial Operation
07 February 2019
Page
65
of
214
7 Installation and Initial Operation
To set up and connect the equipment, note the following:
WARNING
Faulty installation may lead to dangerous situations or severe
loss of property.
Follow the installation and commissioning instructions in this op-
erating manual precisely.
7.1 General Location Requirements for Installation
The following requirements must be met for the installation of the
equipment:
The figures and ranges specified in the chapters “Technical
Data, Connection Values” and “Technical Data, Operating
Conditions” must be observed.
The equipment must only be installed inside a laboratory or a
laboratory-like environment.
The installation site must be level, sufficiently stable and able
to bear loads.
There must not be any sources of electrical interference near
the equipment.
7.2 Minimum Distances
To operate and maintain the unit it must be installed with a mini-
mum spacing of 150 mm from walls, ceilings or other equipment.
7.3 Connecting the Equipment to On-Site Supply Lines
The following chapters describe which connection requirements
must be fulfilled on site and how the equipment is connected to on-
site supply lines.