Minifors 2 - Benchtop Bioreactor
Operation
Page
170
of
214
07 February 2019
Proceed as follows:
Procedure
1.
Connect the nitrogen to the gassing line (O
2
/N
2
IN connec-
tion). In the process, leave the gas supply closed.
INFORMATION
If necessary, enter setpoints for temperature and pH, activate
parameters and press
START
BATCH
and wait until the desired
operating temperature and the expected pH have been reached.
2.
Call up the calibration menu of the pO
2
parameter and wait for
the short initialisation phase to complete.