
Hot-swap power supply installation
The server comes with one power supply. You can add a
second power supply to provide redundant power. After
you install a power supply, check the power supply status
indicators to verify that the power supply is operating
properly. See “Power supplies” on page 250 for details.
Caution
Never remove the cover on a power supply or any
part that has the following label attached.
Hazardous voltage, current, and energy levels are
present inside any component that has this label
attached. There are no serviceable parts inside these
components.
1
2
Refer to the following illustration while performing the steps
in this procedure.
Note
You do not need to turn off the power to the server to
install hot-swap power supplies.
196
Netfinity Server HMM
Summary of Contents for 866251Y - Netfinity 5500 M20
Page 2: ......
Page 8: ...vi Netfinity Server HMM...
Page 336: ...32 33 33 34 35 36 37 38 39 40 41 42 43 328 Netfinity Server HMM...
Page 346: ...338 Netfinity Server HMM...
Page 354: ...346 Netfinity Server HMM...
Page 355: ...Related service information 347...
Page 356: ...348 Netfinity Server HMM...
Page 357: ...Related service information 349...
Page 368: ...360 Netfinity Server HMM...
Page 369: ...Related service information 361...
Page 385: ......
Page 386: ...IBM Part Number 09N1015 Printed in U S A S37L 2 2 1...