7015 Model R24
Dimensions
Height
445.5 mm
17.5 in.
Width
445.5 mm
17.5 in.
Depth
710.0 mm
28.0 in.
Weight
Minimum
51.3 kg
112 lbs.
(Configuration
dependent)
Electrical
Power source loading
0.685
(typical in kVA)
Voltage range (V ac)
200 to 240 or -48V dc
Frequency (hertz)
50 or 60
Thermal output
(typical)
2100 Btu/hr
Power requirements
(typical)
615 watts
Power factor
0.8 to 1.0
Inrush current
³
68 amps
Maximum altitude
2135 m (7000 ft.)
Temperature
Requirements
Operating
10 to 40°C
(50 to 104°F)
Non-Operating
10 to 40°C
(50 to 104°F)
Humidity
(Noncondensing)
Operating
Non-Operating
Without tape drive
8 to 80%
8 to 80%
With tape drive
20 to 80%
20 to 80%
Wet Bulb
Requirements
Without tape drive
27°C (80°F)
27°C (80°F)
With tape drive
23°C (73°F)
27°C (80°F)
Noise Emissions
1,2
Operating
Idle
L
WAd
6.4 bels
6.2 bels
L
pAm
N/A
N/A
<L
pA
>
m
49 dBA
47 dBA
Impulsive or
prominent discrete
tones
No
No
Clearances
Front
Back
Left
Right
Install/Air Flow
Maintenance of a proper service clearance should allow proper air flow.
Service
(See service clearances for the R00 System Rack)
1. See “Noise Emission Notes” on page 336 for definitions of noise emissions positions.
2. Noise emissions data for the Model R24 CPU Media Enclosure are based on the following configuration: the
enclosure is mounted in a R00 System Rack with three 2.0GB SCSI Disk drives are installed, two SCSI Disk
Drawers with three 2.41GB disk drives installed, a power distribution unit is installed in the rack and the system is
operating in a nominal environment of 25°C (78 °F)
3. Inrush currents occur only at initial application of power, no inrush occurs during normal power off-on cycle.
44
Site and Hardware Planning Information
Summary of Contents for 7012 397
Page 1: ...RS 6000 and Eserver pSeries Site and Hardware Planning Information SA38 0508 20...
Page 2: ......
Page 3: ...RS 6000 and Eserver pSeries Site and Hardware Planning Information SA38 0508 20...
Page 11: ...Appendix Notices 385 Index 387 Contents ix...
Page 12: ...x Site and Hardware Planning Information...
Page 16: ...xiv Site and Hardware Planning Information...
Page 18: ...xvi Site and Hardware Planning Information...
Page 26: ...8 Site and Hardware Planning Information...
Page 238: ...220 Site and Hardware Planning Information...
Page 246: ...228 Site and Hardware Planning Information...
Page 284: ...266 Site and Hardware Planning Information...
Page 296: ...278 Site and Hardware Planning Information...
Page 366: ...348 Site and Hardware Planning Information...
Page 372: ...Async Adapter Cable Planning Chart 354 Site and Hardware Planning Information...
Page 377: ...Standard I O Cable Planning Chart Chapter 12 Cable Planning 359...
Page 380: ...Cable Planning Chart Other Adapters 362 Site and Hardware Planning Information...
Page 384: ...366 Site and Hardware Planning Information...
Page 402: ...384 Site and Hardware Planning Information...
Page 404: ...386 Site and Hardware Planning Information...
Page 413: ......
Page 414: ...Printed in USA SA38 0508 20...
Page 415: ...Spine information RS 6000 and Eserver pSeries Site and Hardware Planning Information...