P50 15
″
Display, P70 17
″
Display, P200 and P201 20
″
Displays
P50 15
″
display with a maximum viewable image size of 345 mm (13.6 inches) measured diagonally.
P70 17
″
display with a maximum viewable image size of 403 mm (15.9 inches) measured diagonally.
P200 20
″
display with a maximum viewable image size of 486 mm (19.1 inches) measured diagonally.
P201 20
″
display with a maximum viewable image size of 486 mm (19.1 inches) measured diagonally.
Dimensions
P50 display
Height
374 mm
14.7 in
Width
368 mm
14.5 in
Depth
390 mm
15.3 in
P70 display
Height
414 mm
16.3 in
Width
406 mm
15.9 in
Depth
453 mm
17.8 in
P200 and P201
display
Height
474 mm
18.6 in
Width
474 mm
18.6 in
Depth
505 mm
19.9 in
Weight
P50
14.0 kg
30.8 lbs
P70
23.0 kg
50.6 lbs
P200
30.0 kg
66.3 lbs
P201
31.5 kg
69.4 lbs
Electrical
Power source loading
.38
(typical in kVA)
Voltage range (V ac)
100 to 120 or 200 to 240 (autoranging)
Frequency (hertz)
50 or 60
Thermal output
(typical)
480 Btu/hr
Power requirements
(typical)
P50=110 watts, P70=140 watts P200=140 watts, P201=150 watts
Power factor
0.85
Maximum altitude
3048 m (10000 ft.)
Temperature
Requirements
Operating
10 to 40°C
(50 to 104°F)
Non-Operating
0 to 60°C
(32 to 140°F)
Humidity
Requirements
Operating
Non-Operating
(Noncondensing)
8 to 80 %
5 to 90 %
Noise Emissions*
Operating
Idle
L
WAd
3.5 bels
3.5 bels
Clearances
Front
Back
Left
Right
152mm (6 in)
152mm (6 in)
152mm (6 in)
152mm (6 in)
Service
Install so that air vents are not blocked.
* See “Noise Emission Notes” on page 336 for definitions of noise emissions positions.
224
Site and Hardware Planning Information
Summary of Contents for 7012 397
Page 1: ...RS 6000 and Eserver pSeries Site and Hardware Planning Information SA38 0508 20...
Page 2: ......
Page 3: ...RS 6000 and Eserver pSeries Site and Hardware Planning Information SA38 0508 20...
Page 11: ...Appendix Notices 385 Index 387 Contents ix...
Page 12: ...x Site and Hardware Planning Information...
Page 16: ...xiv Site and Hardware Planning Information...
Page 18: ...xvi Site and Hardware Planning Information...
Page 26: ...8 Site and Hardware Planning Information...
Page 238: ...220 Site and Hardware Planning Information...
Page 246: ...228 Site and Hardware Planning Information...
Page 284: ...266 Site and Hardware Planning Information...
Page 296: ...278 Site and Hardware Planning Information...
Page 366: ...348 Site and Hardware Planning Information...
Page 372: ...Async Adapter Cable Planning Chart 354 Site and Hardware Planning Information...
Page 377: ...Standard I O Cable Planning Chart Chapter 12 Cable Planning 359...
Page 380: ...Cable Planning Chart Other Adapters 362 Site and Hardware Planning Information...
Page 384: ...366 Site and Hardware Planning Information...
Page 402: ...384 Site and Hardware Planning Information...
Page 404: ...386 Site and Hardware Planning Information...
Page 413: ......
Page 414: ...Printed in USA SA38 0508 20...
Page 415: ...Spine information RS 6000 and Eserver pSeries Site and Hardware Planning Information...