7015 Models R10, R20, and R21 CPU Drawers
Dimensions
Height
266.7 mm
10.5 in.
Width
445.5 mm
17.5 in.
Depth
610.0 mm
24.0 in.
Weight
Minimum
30.3 kg
65 lbs.
(Configuration
dependant)
Electrical
Power source loading
0.29KVA
(typical in kVA)
Voltage range (V ac)
200 to 240
Frequency (hertz)
50 or 60
Thermal output
(typical)
850 Btu/hr
Power requirements
(typical)
250 watts ( Model R10)
280 watts (Model R20)
Power factor
0.85 min
Inrush current
³
20 amps
Maximum altitude
2135 m (7000 ft.)
Temperature
Requirements
Operating
10 to 40°C
(50 to 104°F)
Non-Operating
10 to 40°C
(50 to 104°F)
Humidity
(Noncondensing)
Operating
Non-Operating
Without tape drive
8 to 80%
8 to 80%
With tape drive
20 to 80%
20 to 80%
Wet Bulb
Requirements
Without tape drive
27°C (80°F)
27°C (80°F)
With tape drive
23°C (73°F)
27°C (80°F)
Noise Emissions
1,2
Operating
Idle
L
WAd
6.4 bels
6.2 bels
L
pAm
N/A
N/A
<L
pA
>
m
49 dBA
47 dBA
Impulsive or
prominent discrete
tones
No
No
Clearances
Front
Back
Left
Right
Install/Air Flow
Maintenance of a proper service clearance should allow proper air flow.
Service
(See service clearances for the R00 System Rack)
1. See “Noise Emission Notes” on page 336 for definitions of noise emissions positions.
2. Noise emissions data for Models R10 and R20 CPU Drawers are based on a processor drawer mounted in a
R00 System Rack.
3. Inrush currents occur only at initial application of power, no inrush occurs during normal power off-on cycle.
Chapter 2. Physical Characteristics of Systems
43
Summary of Contents for 7012 397
Page 1: ...RS 6000 and Eserver pSeries Site and Hardware Planning Information SA38 0508 20...
Page 2: ......
Page 3: ...RS 6000 and Eserver pSeries Site and Hardware Planning Information SA38 0508 20...
Page 11: ...Appendix Notices 385 Index 387 Contents ix...
Page 12: ...x Site and Hardware Planning Information...
Page 16: ...xiv Site and Hardware Planning Information...
Page 18: ...xvi Site and Hardware Planning Information...
Page 26: ...8 Site and Hardware Planning Information...
Page 238: ...220 Site and Hardware Planning Information...
Page 246: ...228 Site and Hardware Planning Information...
Page 284: ...266 Site and Hardware Planning Information...
Page 296: ...278 Site and Hardware Planning Information...
Page 366: ...348 Site and Hardware Planning Information...
Page 372: ...Async Adapter Cable Planning Chart 354 Site and Hardware Planning Information...
Page 377: ...Standard I O Cable Planning Chart Chapter 12 Cable Planning 359...
Page 380: ...Cable Planning Chart Other Adapters 362 Site and Hardware Planning Information...
Page 384: ...366 Site and Hardware Planning Information...
Page 402: ...384 Site and Hardware Planning Information...
Page 404: ...386 Site and Hardware Planning Information...
Page 413: ......
Page 414: ...Printed in USA SA38 0508 20...
Page 415: ...Spine information RS 6000 and Eserver pSeries Site and Hardware Planning Information...