9295 Multiple Digital Trunk Processor With DC Power Supply
Dimensions
Base Unit
Each T1 or CEPT
Second Power
feature
Supply feature
Height
266 mm 10.5 in.
264 mm 10.3 in.
264.0 mm 10.3 in.
Width
449 mm 17.6 in.
50 mm 1.9 in.
69.5 mm 2.7 in.
Depth
400 mm 15.7 in.
373 mm 14.6 in.
373.0 mm 14.6 in.
Weight
Minimum
13.2 kg 29.2 lbs.
2.1 kg 4.6 lbs.
5.0 kg 11.0 lbs.
Maximum
13.2 kg 29.2 lbs.
2.1 kg 4.6 lbs.
5.0 kg 11.0 lbs.
Electrical
Voltage range (V dc)
-48 to -60 Vdc
Thermal output
1030 Btu/hr
per power supply
Power requirements
300 watts
per power supply
Maximum altitude
2135 m (7000 ft.)
Temperature
Requirements
Operating
10 to 40°C
(50 to 104°F)
Non-Operating
10 to 43°C
(50 to 110°F)
Humidity
Requirements
Operating
Non-Operating
(Noncondensing)
8 to 80%
8 to 80%
Wet Bulb
27°C (80°F)
27°C (80°F)
Noise Emissions
¹
Operating
Idle
L
WAd
6.0 bels
6.0 bels
L
pAm
N/A
N/A
<L
pA
>
m
42 dBA
42 dBA
Impulsive or
prominent discrete
tones
No
No
Clearances
Front
Back
Left
Right
Install/Air Flow
²
152 mm(6 in)
152 mm(6 in)
N/A
N/A
Service
152 mm(6 in)
N/A
N/A
N/A
Footprint
2
Width
449mm(17.6 in)
Depth
704mm(27.7 in)
1. See “Noise Emission Notes” on page 336 for definitions of noise emissions positions.
2. The amount of space needed by the unit during normal operation is indicated by the footprint dimensions.
330
Site and Hardware Planning Information
Summary of Contents for 7012 397
Page 1: ...RS 6000 and Eserver pSeries Site and Hardware Planning Information SA38 0508 20...
Page 2: ......
Page 3: ...RS 6000 and Eserver pSeries Site and Hardware Planning Information SA38 0508 20...
Page 11: ...Appendix Notices 385 Index 387 Contents ix...
Page 12: ...x Site and Hardware Planning Information...
Page 16: ...xiv Site and Hardware Planning Information...
Page 18: ...xvi Site and Hardware Planning Information...
Page 26: ...8 Site and Hardware Planning Information...
Page 238: ...220 Site and Hardware Planning Information...
Page 246: ...228 Site and Hardware Planning Information...
Page 284: ...266 Site and Hardware Planning Information...
Page 296: ...278 Site and Hardware Planning Information...
Page 366: ...348 Site and Hardware Planning Information...
Page 372: ...Async Adapter Cable Planning Chart 354 Site and Hardware Planning Information...
Page 377: ...Standard I O Cable Planning Chart Chapter 12 Cable Planning 359...
Page 380: ...Cable Planning Chart Other Adapters 362 Site and Hardware Planning Information...
Page 384: ...366 Site and Hardware Planning Information...
Page 402: ...384 Site and Hardware Planning Information...
Page 404: ...386 Site and Hardware Planning Information...
Page 413: ......
Page 414: ...Printed in USA SA38 0508 20...
Page 415: ...Spine information RS 6000 and Eserver pSeries Site and Hardware Planning Information...