Notes:
1.
The
FC
5075
Expansion
I/O
Tower
contains
two
system
PCI
busses.
2.
In
the
FC
5075
Expansion
I/O
Tower
FRU
locations
and
failing
components
table,
the
first
of
the
two
busses
in
the
tower
is
designated
as
″
xxxx
″
and
the
second
bus
in
the
tower
is
designated
as
″
yyyy
″
.
3.
In
FC
5075
towers,
the
two
bus
numbers
assigned
to
the
busses
are
not
required
to
be
in
any
order.
4.
There
is
an
embedded
CFIOP
in
the
tower
card
in
position
CB1.
This
IOP
is
in
the
C01
-
C04
multi-adapter
bridge
domain.
5.
Card
position
C05
is
required
to
be
an
I/O
processor
when
any
cards
installed
in
the
C05
-
C08
multi-adapter
bridge
domain.
6.
J11
is
an
RPO
connection,
J14
is
a
uninterruptable
power
supply
connector,
J15
is
an
SPCN
1
connector,
and
J16
is
an
SPCN
2
connector.
7.
Multi-adapter
bridge
domains
are
labeled
PCI
Bridge
Set
inside
the
tower.
8.
The
following
table
provides
information
necessary
to
identify
the
IOP
to
which
IOAs
are
assigned.
v
The
left
column
indicates
the
domain
in
which
IOA
assignment
is
allowed.8:32
AM
10/21/2002
v
The
right
column
is
used
to
determine
the
IOP
to
which
an
IOA
is
assigned.
v
The
first
position
in
the
list
must
be
an
IOP.
The
remaining
positions
may
be
IOPs
or
IOAs.
IOAs
are
assigned
to
the
first
IOP
located
to
their
left
in
the
list.
Although
IOAs
can
be
manually
reassigned
using
SST/DST,
the
IOA
assignments
return
to
the
default
order
after
each
IPL.
Table
2.
IOA
assignment
rules
Multi-adapter
bridge
domain
/
PCI
bridge
set
IOA
assignment
rules
CB1,
C01
-
C04
CB1,
C01,
C02,
C03,
C04
C05
-
C08
C05,
C06,
C07,
C08
Locations
—
FC
5078,
0578
Expansion
I/O
Unit
For
use
by
authorized
service
providers.
The
following
diagram
shows
FRU
layout
in
the
FC
5078,
0578
Expansion
I/O
Unit.
Use
it
with
the
tables
below.
If
you
need
address
information,
refer
to
Figure
1.
Locations
for
FC
5078,
0578
Expansion
I/O
Unit
Figure
2.
Locations
for
FC
5078,
0578
Expansion
I/O
Unit
Analyze
hardware
problems
301
Summary of Contents for 270
Page 2: ......
Page 12: ...x Hardware Remove and Replace Part Locations and Listings...
Page 279: ...Figure 3 CCIN 2881 with pluggable DIMM Analyze hardware problems 267...
Page 281: ...Figure 6 Models 830 SB2 with FC 9074 HSL and SPCN locations Analyze hardware problems 269...
Page 283: ...Figure 1b Model 840 SB3 processor tower dual line cord Analyze hardware problems 271...
Page 294: ...01 gif port and LED locations 282 Hardware Remove and Replace Part Locations and Listings...
Page 295: ...s src rzaq4519 gif locations Analyze hardware problems 283...
Page 483: ...Table 1 Cover assembly FC 5095 Expansion I O Tower Analyze hardware problems 471...
Page 614: ...602 Hardware Remove and Replace Part Locations and Listings...
Page 618: ...606 Hardware Remove and Replace Part Locations and Listings...
Page 621: ......
Page 622: ...Printed in USA SY44 5917 02...