h.
Power
the
expansion
unit
back
on.
See
the
10.
After
exchanging
an
item,
go
to
This
ends
the
procedure.
FC
5095,
FC
0595
remove
and
replace
procedures
For
use
by
authorized
service
providers.
FC
5095,
FC
0595
-
Air
moving
device
-
B01,
B02,
B03,
and
B04
FC
5095,
FC
0595
-
Cards
(concurrent)
FC
5095,
FC
0595
-
Cards
(dedicated)
FC
5095,
FC
0595
-
Covers
FC
5095,
FC
0595
-
Device
board
-
DB1
and
DB2
FC
5095,
FC
0595
-
Disk
unit
(concurrent)
FC
5095,
FC
0595
-
Disk
unit
(dedicated)
FC
5095,
FC
0595
-
Display
panel
-
NB1
FC
5095,
FC
0595
-
Power
distribution
backplane
-
PB1
FC
5095,
FC
0595
-
Power
supply
-
P01
and
P02
FC
5095,
FC
0595
-
Tower
card
-
CB1
FC
5095,
FC
0595
-
Air
moving
device
-
B01,
B02,
B03,
and
B04
For
use
by
authorized
service
providers.
Use
this
procedure
to
remove
or
replace
the
air
moving
device
(AMD)
-
B01,
B02,
B03,
and
B04
in
an
FC
5095,
FC
0595.
Four
running
Air
Moving
Devices
(AMDs)
and
two
power
supplies
must
be
installed
and
powered
on
to
perform
this
procedure.
To
remove
or
replace
the
AMDs:
1.
Are
there
four
running
AMDs
and
two
power
supplies
(powered
on)
installed
in
the
expansion
unit?
v
Yes:
Continue
with
the
next
step.
v
No:
Perform
the
following:
a.
Power
down
the
expansion
unit.
See
b.
Remove
the
power
cord
from
the
rear
of
the
expansion
unit,
and
continue
with
the
next
step.
2.
Remove
the
right
or
top
side
cover,
depending
on
expansion
unit
orientation.
See
3.
Pull
the
fastener
on
the
front
of
the
AMD
casing.
4.
Pull
open
and
remove
the
AMD.
The
power
connection
will
undock
automatically.
5.
Install
the
AMD
by
reversing
this
procedure.
After
exchanging
an
item,
go
to
This
ends
the
procedure.
Analyze
hardware
problems
191
Summary of Contents for 270
Page 2: ......
Page 12: ...x Hardware Remove and Replace Part Locations and Listings...
Page 279: ...Figure 3 CCIN 2881 with pluggable DIMM Analyze hardware problems 267...
Page 281: ...Figure 6 Models 830 SB2 with FC 9074 HSL and SPCN locations Analyze hardware problems 269...
Page 283: ...Figure 1b Model 840 SB3 processor tower dual line cord Analyze hardware problems 271...
Page 294: ...01 gif port and LED locations 282 Hardware Remove and Replace Part Locations and Listings...
Page 295: ...s src rzaq4519 gif locations Analyze hardware problems 283...
Page 483: ...Table 1 Cover assembly FC 5095 Expansion I O Tower Analyze hardware problems 471...
Page 614: ...602 Hardware Remove and Replace Part Locations and Listings...
Page 618: ...606 Hardware Remove and Replace Part Locations and Listings...
Page 621: ......
Page 622: ...Printed in USA SY44 5917 02...