To
replace
the
bulk
power
controller
(BPC):
1.
Ensure
that
all
of
the
BPR’s
on-lock/off-unlock
switches
are
in
the
off
position
on
this
BPA
before
proceeding.
2.
Slowly
slide
the
unit
into
the
slot
and
seat
it
carefully
against
the
backplane,
avoiding
damage
to
the
connectors.
3.
Tighten
the
left
and
right
thumb
screws
with
the
torque
tool
(PN
6422789).
4.
Ensure
that
the
Unit
Emergency
Power
Off
(UEPO)
bypass
switch,
on
the
BPC
front
panel,
is
in
the
’normal’
position.
5.
Plug
all
cables
into
the
BPC
according
to
cable
labeling.
6.
Turn
on
(left)
all
of
the
BPR’s
on-lock/off-unlock
switches.
7.
To
indicate
completion
of
these
steps,
press
the
(white)
Service
Complete
button
on
the
UEPO
panel.
The
BPA
will
automatically
configure
while
it
is
energized.
This
ends
the
procedure.
Models
870
and
890
-
Bulk
power
distribution
(BPD)
For
use
by
authorized
service
providers.
Use
this
procedure
to
remove
or
replace
the
bulk
power
distribution
(BPD)
on
the
Models
870
and
890.
There
are
two
BPD
positions
located
immediately
above
the
bulk
power
controller
(BPC).
The
upper
most
position
is
featurable,
and
if
it
is
not
used
an
appropriate
air
flow
baffle
must
be
inserted.
See
To
remove
the
bulk
power
distribution
(BPD):
1.
Do
not
power
down
the
system
if
it
is
powered
on;
this
procedure
can
be
done
concurrently.
2.
Locate
the
BPD
to
be
replaced
by
decoding
the
SRC
(see
or
see
3.
Open
the
cover
to
access
the
field
replaceable
unit
(FRU).
See
4.
Note
the
state
of
the
BPD’s
LED.
Then,
press
the
(green)
Start
Service
button
on
the
UEPO
panel,
and
only
proceed
if
the
LED
is
off
or
the
repair
has
been
scheduled
(System
outage
-
EPO
off).
5.
Locate
the
bulk
power
regulator
(BPR)
on
the
affected
bulk
power
assembly
(BPA).
Manually
turn
off
(to
the
right)
the
BPR’s
on-lock/off-unlock
switch
on
these
BPRs.
6.
Verify
that
all
cables
are
labeled
for
plug
location,
and
then
unplug
the
cables
from
the
BPD.
7.
Loosen
the
left
and
right
thumb
screws
using
the
torque
tool
(PN
6422789),
and
slide
the
unit
out
of
the
slot.
This
is
the
same
way
to
remove
the
bulk
power
baffles
(BPBs).
Note:
The
BPD
weighs
approximately
5
pounds.
To
replace
the
bulk
power
distribution
(BPD):
1.
Important:
Ensure
that
all
BPR’s
on-lock/off-unlock
switches
are
in
the
’off’
position
on
this
BPA
before
proceeding.
2.
Slowly
slide
the
unit
into
the
slot
and
seat
it
carefully
against
the
backplane
to
avoid
damaging
connectors.
3.
Tighten
the
left
and
right
thumb
screws
with
the
torque
tool
(PN
6422789).
4.
Plug
all
the
cables
to
the
BPD,
ensuring
correspondence
of
plug
locations
and
cable
labeling.
5.
Manually
set
all
BPR’s
on-lock/off-unlock
switches
to
the
’on’
position
(to
the
left)
contained
in
the
associated
BPA.
6.
To
indicate
completion
of
these
steps,
press
the
(white)
Service
Complete
button
on
the
UEPO
panel.
This
ends
the
procedure.
94
Hardware
(Remove
and
Replace;
Part
Locations
and
Listings)
Summary of Contents for 270
Page 2: ......
Page 12: ...x Hardware Remove and Replace Part Locations and Listings...
Page 279: ...Figure 3 CCIN 2881 with pluggable DIMM Analyze hardware problems 267...
Page 281: ...Figure 6 Models 830 SB2 with FC 9074 HSL and SPCN locations Analyze hardware problems 269...
Page 283: ...Figure 1b Model 840 SB3 processor tower dual line cord Analyze hardware problems 271...
Page 294: ...01 gif port and LED locations 282 Hardware Remove and Replace Part Locations and Listings...
Page 295: ...s src rzaq4519 gif locations Analyze hardware problems 283...
Page 483: ...Table 1 Cover assembly FC 5095 Expansion I O Tower Analyze hardware problems 471...
Page 614: ...602 Hardware Remove and Replace Part Locations and Listings...
Page 618: ...606 Hardware Remove and Replace Part Locations and Listings...
Page 621: ......
Page 622: ...Printed in USA SY44 5917 02...