8-171
3. TRACK ROLLER
REMOVAL
Loosen tension of the track link.
(1)
1)
Frame
Grease
valve
1
2
INSTALL
Carry out installation in the reverse order
to removal.
2)
(1)
Remove the mounting bolt (1) and draw
out the track roller (2).
·
Weight : 24 kg (53 lb)
(3)
Using the work equipment, push up track
frame on side which is to be removed.
After jack up the machine, set a block
under the unit.
(2)
※
8-163(1)
8-163(3)
90~110
140Z98UC05
Summary of Contents for HX130 LCR
Page 11: ...1 1 SECTION 1 GENERAL Group 1 Safety Hints 1 1 Group 2 Specifications 1 10 ...
Page 174: ...4 5 MEMORANDUM HYUNDAI HEAVY INDUSTRIES CO LTD CONSTRUCTION EQUIPMENT DIV ...
Page 536: ...8 108 125LCR8TM30 Turn casing 1 upside down and remove oil seal 3 using jig 29 ...
Page 566: ...8 138 Remove lock nut 22 and then boot 23 14 36078RL14 2507ARL10 ...