4-2
2. LOCATION 2
38
40
39
15
SHUTTLE BLOCK
MAIN CONTROL VALVE
33
14
12
26
6
5
3
27
2
7'
11
1
37
1
4
1
1
E
CAB
MAIN PUMP
BOOM SAFETY VALVE
BOOM
4 CARTRIDGE
VALVE
Patt
Ai
22
21
a2
Pi1
Pi2
a4
10
8
9
28
28
a1
29
24
17
h1
d1
c
e2
16
18
20
1
30
31
32
7
35
36
34
SAFETY
SOL VALVE
25
13
1 Work
lamp
2 Fuel
sender
3 Fuel filler pump
4 Beacon
lamp
5 Battery
6 Battery
relay
7 Horn - high
7' Horn - low
8 P1 pressure sensor
9 P2 pressure sensor
10 EPPR pressure sensor
11 Overload pressure sensor
12 Start
relay
13 Power
relay
14 Alternator
15 Travel alarm buzzer
16 Arm
/
Bucket in pressure sensor
17 Boom up pressure sensor
18 Swing pressure sensor
20 Arm in pressure sensor
21 Attach pressure sensor
22 Travel pressure sensor
24 4 cartridge valve
25 Pump EPPR valve
26 Boom priority EPPR valve
27 Machine control unit - option
28 Nega-control pressure sensor
29 Flow control EPPR valve
30 Relay drive unit
31 PVG 32 controller
32 Air cleaner indicator
33 Earth
strap
34 Safety solenoid valve
35 Swing fine solenoid valve
36 Swing lock solenoid valve
37 Electric
equalizer
38 Quick clamp solenoid valve
39 Button key control unit
40 Around view camera controller
130ZF4EL02
4-2
Summary of Contents for HX130 LCR
Page 11: ...1 1 SECTION 1 GENERAL Group 1 Safety Hints 1 1 Group 2 Specifications 1 10 ...
Page 174: ...4 5 MEMORANDUM HYUNDAI HEAVY INDUSTRIES CO LTD CONSTRUCTION EQUIPMENT DIV ...
Page 536: ...8 108 125LCR8TM30 Turn casing 1 upside down and remove oil seal 3 using jig 29 ...
Page 566: ...8 138 Remove lock nut 22 and then boot 23 14 36078RL14 2507ARL10 ...