8-98
Assemble carrier 1 assembly (12) into the
ring gear (27).
27
15
(10)
Hammer 4 knock pins (28) around the ring
gear (27).
Assemble sun gear 1 (24) to the drive shaft
of the swing reduction gear.
24
28
(11)
(12)
30
Apply loctite to the tapped holes of the ring
gear (27) and then mount swing motor onto
the ring gear (27).
Don't fail to coincide the gauge bar hole.
Tighten socket bolts (30) around the swing
motor assembly.
·
Tightening torque : 13.5 kgf
·
m (98 lbf
·
ft)
31
32
32
38
(13)
※
(14)
Assemble plugs (31, 32) and level gauge
(38).
(15)
130ZF8sm20
130ZF8sm26
130ZF8sm06
130ZF8sm27
Summary of Contents for HX130 LCR
Page 11: ...1 1 SECTION 1 GENERAL Group 1 Safety Hints 1 1 Group 2 Specifications 1 10 ...
Page 174: ...4 5 MEMORANDUM HYUNDAI HEAVY INDUSTRIES CO LTD CONSTRUCTION EQUIPMENT DIV ...
Page 536: ...8 108 125LCR8TM30 Turn casing 1 upside down and remove oil seal 3 using jig 29 ...
Page 566: ...8 138 Remove lock nut 22 and then boot 23 14 36078RL14 2507ARL10 ...