NOTE
In this network, the SCUB control board (in slot 9 or 10) is used for upstream transmission, and the upstream
port is 0/19/0. In addition, the GIU upstream interface board (in slot 19 or 20) can be used for upstream
transmission. Alternatively, you need to run the
electro-switch0 location-1
command to switch the
electronic switch to the GIU upstream interface board for upstream transmission. By default, the electronic
switch is in the
location-0
state, which indicates that the control board is used for upstream transmission.
Figure 1-18
Example network for inband management through telnet in a LAN
PC
PC
LAN
PC
LSW
Access node
Figure 1-19
Example network for inband management through telnet in a WAN
Router
PC
Access node
Data Plan
provide the data plan for the inband management through telnet in
a LAN and in a WAN respectively.
Table 1-14
Data plan for the inband management through telnet in a LAN
Item
Data
Upstream port of the MA5600T/MA5603T/
MA5608T
l
VLAN ID: 30
l
Port: 0/19/0
l
IP address: 10.50.1.10/24
SmartAX MA5600T/MA5603T/MA5608T Multi-service
Access Module
Commissioning and Configuration Guide
1 Commissioning
Issue 01 (2014-04-30)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
33