Table 1-29
Commands for configuring the EPS75-4815AF
To...
Run the Command...
Add an EMU
emu add
Query the configuration
parameters of the power system
display power system parameter
Query the power environment
parameters
display power environment parameter
Query the alarm information of
the power supply
display power alarm
Configure the battery charging
parameters
power charge
Configure the battery
management parameters
power battery parameter
Configure the upper/lower
temperature alarm limits or the
upper/lower temperature test
limits
power battery temperature
Configure the battery set power-
off parameters
power off
Configure the power distribution
parameters
power supply-parameter
Configure the battery
discharging test parameters
power battery-test
Configure the parameters for the
power rectifier module
power module-num
Configure the battery high-
temperature power-off
parameters
power temperature-off
Configure the environment
monitoring parameters
power environment
Configure the external extended
digital parameters
power outside-digital
1.
Log in to the device through the maintenance terminal and add an EMU.
2.
Query the status of the EPS75-4815AF.
3.
Enter the environment monitoring configuration mode and query the default configuration.
4.
Configure the battery management parameters.
5.
Configure the battery discharging test parameters.
SmartAX MA5600T/MA5603T/MA5608T Multi-service
Access Module
Commissioning and Configuration Guide
1 Commissioning
Issue 01 (2014-04-30)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
97