iManager NetEco 6000
Device Installation and Commissioning Guide
4 Connecting Monitoring Cables to Devices
Issue 03 (2019-03-10)
Copyright © Huawei Technologies Co., Ltd.
71
Procedure
Step 1
Connect one end of the network cable to the monitoring port on the smart cooling product.
For NetCol5000C-65kW&80kW, open the rear door, and connect one end of the network
cable to the FE port on the main control panel of the smart cooling product.
Figure 4-15
NetCol5000C-65kW&80kW main control panel
(1) Main control panel