iManager NetEco 6000
Device Installation and Commissioning Guide
3 Installing Devices
Issue 03 (2019-03-10)
Copyright © Huawei Technologies Co., Ltd.
17
Figure 3-4
Installing a server
Step 4
Connect the server power cables to the PDU2000.
The server uses dual power supplies. Connect the two power cables to different PDU2000s.
Figure 3-5
Connecting server power cables
----End