iManager NetEco 6000
Device Installation and Commissioning Guide
6 Adding Devices
Issue 03 (2019-03-10)
Copyright © Huawei Technologies Co., Ltd.
136
2.
On the CIM WebUI home page, choose
Monitoring
>
CIM System
>
Running
Parameter
>
Parallel Configuration
, and set
CIM parallel Qty.
.
Figure 6-10
Setting the number of parallel CIMs
3.
On the CIM WebUI home page, choose
Monitoring
>
CIM System
>
Running
Parameter
>
Parallel Configuration
, and set the IP address for each CIM in the
parallel system.
Figure 6-11
Configuring the communication address for the parallel CIMs
4.
On the CIM WebUI home page, choose
Monitoring
>
CIM System
>
Running
Parameter
>
Basic Information
, and set
Current source
,
Battery N wire
,
Total
battery capacity
,
Batt. installation time
, and
Multi-Hall cur. setting
.
The value of
Multi-Hall cur. setting
equals the number of positive or negative Hall effect sensors in
a single battery string and should be greater than or equal to 1.
After the intelligent battery monitoring system is initially connected, if the SOC and SOH of CIM
differ too much from those of the UPS, set
SOC correction value
and
SOH correction value
based
on the reference values in the UPS.
Figure 6-12
Setting basic information