iManager NetEco 6000
Device Installation and Commissioning Guide
6 Adding Devices
Issue 03 (2019-03-10)
Copyright © Huawei Technologies Co., Ltd.
127
Item
Description
Configuration Requirements
UPS
Working
Mode
UPS working mode of the
created management
domain
Select
N
,
N+X(X=1–N)
,
2N
, or
2(N+1)
from
the drop-down list box.
Has
Generator
Generator for the created
management domain
Select
NULL
,
Single Generator
, or
Dua
Generator
from the drop-down list box.
Frequency
Mains frequency of the
created management
domain
Select
50HZ
or
60HZ
from the drop-down list
box.
Refrigeration Info
Cooling
Model
Cooling mode of the
created management
domain
Select
Water Cooled Direct Expansion
,
Air
Cooled Direct Expansion
, or
Chilled-water
refrigeration
from the drop-down list box.
Air-Distribu
tion
Air supply mode of the
created management
domain
Select
Vertical under-floor Air-distribution
or
Horizontal displacement Air-distribution
from the drop-down list box.
Plan
Refrigeratin
g
Capacity(k
W)
Cooling power of the
created management
domain
Range: floating point number of 1-10000000
(accurate to three decimal places)
The parameters with
*
must be set. Other parameters are optional. The value of
Planned Rack Position
cannot be changed after it is set. The number of racks cannot exceed the planned number of rack places.
Therefore, the planned number of rack places should be set to a value great enough to meet the
requirements for rack view creation.
4.
Click
on the toolbar.
Repeat steps
to
until the configuration is complete.
Step 3
Click
on the toolbar.
----End
6.1.2 Adding a Module
You can create a modular in the equipment room, branch, root node, union box, or subnet
management domain.
Prerequisites
You have logged in to the NetEco client by web browser
You have created an equipment room or NetEco site in
Data Center Planning
. For
detailed operations, see
Creating a Domain
.