iManager NetEco 6000
Device Installation and Commissioning Guide
6 Adding Devices
Issue 03 (2019-03-10)
Copyright © Huawei Technologies Co., Ltd.
197
Step 6
Set
AI/DI_1 Power Supply
to
On
.
Step 7
Click
Submit
.
----End
6.4.2.1.4 Creating an Icon for a Door Status Sensor on the NetEco
This section describes how to create and configure an icon for a door status sensor in an
equipment room or container.
Prerequisites
You have logged in to the NetEco client by web browser
You have the operation rights for configuring
Data Center View
.
Procedure
Step 1
Choose
Monitor
>
Topo
>
Data Center View
from the main menu. The
Data Center View
window is displayed.
Step 2
In the 3D view editing window, click
.The
Toolbox
dialog box is displayed.
Step 3
Drag
to the required position in the view. The
Property Panel
dialog box is
displayed, as shown in
You can drag
in the toolbox to create an icon for a door status sensor.