STARTING/CHARGING (J05E)
16–21
(3)
Install the 4 through bolts.
Tightening Torque:
6.5-9.3 N·m {66-95 kgf·cm, 4.8-6.9 lbf·ft}
(4)
Using the 4 screws, install the stator outlet terminal to the rectifier.
Tightening Torque:
1.9-2.5 N·m {19-25 kgf·cm, 1.4-1.8 lbf·ft}
(5)
Using the 3 screws, install the rear cover.
PERFORMANCE TEST
1.
MATTER FOR REFERENCE
NOTICE
•
Using the bench tester, perform a performance test accord-
ing to the procedure described below.
•
Note the battery polarity carefully so as not to make reverse
connections.
If the connections are reversed, the rectifier will short the cir-
cuit and allow a large current to flow through and damage the
diodes and I.C. regulator as well as burning the wiring har-
ness.
•
Take care not to make wrong connections of terminals.
•
When charging the battery with a quick charge, disconnect
the battery terminals.
•
Do not perform tests with high voltage insulation resistance
tester.
•
In operation, never disconnect the battery.
•
During this inspection, make sure to use a fully charged bat-
tery.
THROUGH BOLT
SHTS021271500058
SCREW
SHTS021271500059