EXHAUST (J05E)
11–29
INSPECTION BY WAY OF HINO-DX
EN01F02127100402002005
1.
DPR STATUS CHECK
(1)
Select the "DPR Reset confirmation" in the "Check function"
menu of HINO-DX.
(2)
Confirm Data View of the "DPR status display"display (monitor), if
the value for all the items are "OFF", DPR functions normally.
Then "Manual forced regeneration" and "DPR differential pressure
check" can be done.
(3)
In case "ON" is displayed in Data View of the "DPR status display"
display (monitor), check according to the procedure on page.
2.
FORCED REGENERATION
(1)
Forced regeneration is done by the "Manual forced regeneration"
screen.
! CAUTION
•
Confirm safety of the surrounding area, then press DPR
regeneration switch inside the cabin to execute the regenera-
tion.
•
Confirm the PTO switch is OFF.
SHTS021271000043