MAN3184 - TITANUS PRO
•
SENS®
124
6.8 Installing the second detector module
Figure 78:
Installing detector module II
► Only perform the following work with the device disconnected from the
mains.
► Carefully unlock the clips on the housing using a flat-head screwdriver
by simultaneously pressing in the closing flaps on one side. Then
carefully lift the housing cover. Pull the cable from the display basic
board and remove the housing cover.
► Carefully remove the fan cover for the aspiration duct (self-adhesive
plastic cover). Use a screwdriver if required.
► Carefully break the seal on the housing for connection of the second
pipe system (predetermined breaking point marked with "II") using a
screwdriver.
► Spread the two retaining clips and insert the new detector module. Both
clips must be positioned against the detector module and audibly
engage. Then press both retaining clips together again.
► Unplug the jumper JU4 from the basic board.
Summary of Contents for Ampac TITANUS PRO-SENS
Page 51: ...MAN3184 TITANUS PRO SENS 51 Figure 34 Pipe shapes...
Page 61: ...MAN3184 TITANUS PRO SENS 61 Figure 36 Example pipe project planning with pipe accessories...
Page 118: ...MAN3184 TITANUS PRO SENS 118 Figure 73 Drill hole intervals for bracket type MT 1 mm...
Page 135: ...MAN3184 TITANUS PRO SENS 135 Figure 84 Attaching the aspiration reducing film sheet...