5.1.5 Project planning limits
The following threshold values must be observed for every connected pipe
system:
Standard project planning
▪ The minimum pipe length between 2 aspiration apertures is 4 m.
▪ The maximum pipe length between 2 aspiration apertures is 12 m.
▪ The maximum overall pipe length is 200 m
(2x 200 m with 2 connected pipe systems).
▪ A maximum of 24 aspiration apertures are possible for each detector
module.
Simplified project planning
▪ The minimum pipe length between 2 aspiration apertures is 0.1 m.
▪ The maximum pipe length between 2 aspiration apertures is 4 m.
▪ The maximum overall pipe length is 100 m
(2x 100 m with 2 connected pipe systems).
▪ A maximum of 20 aspiration apertures are possible for each detector
module.
Project planning with acceleration openings
▪ The minimum pipe length between 2 aspiration apertures is 2.5 m.
▪ The maximum pipe length between 2 aspiration apertures is 12 m.
▪ The maximum overall pipe length is 300 m
(2x 280 m with 2 connected pipe systems).
▪ The maximum number of aspiration apertures is 100
(2x 72 with 2 connected pipe systems).
The maximum monitoring area per aspiration aperture corresponds with the
monitoring area of point detectors according to the project planning guideline
to be applied.
The maximum total monitoring area, the maximum overall pipe length and
the maximum number of aspiration apertures depend on the selected project
planning, as well as restrictions imposed by national provisions.
Summary of Contents for Ampac TITANUS PRO-SENS
Page 51: ...MAN3184 TITANUS PRO SENS 51 Figure 34 Pipe shapes...
Page 61: ...MAN3184 TITANUS PRO SENS 61 Figure 36 Example pipe project planning with pipe accessories...
Page 118: ...MAN3184 TITANUS PRO SENS 118 Figure 73 Drill hole intervals for bracket type MT 1 mm...
Page 135: ...MAN3184 TITANUS PRO SENS 135 Figure 84 Attaching the aspiration reducing film sheet...