
Stiffener Splice Location
1. All stiffeners should be installed on the exterior of the bin.
2. Align the stiffener splice (32 or 33) with the holes at the ends of the two stiffeners (29 and 31).
NOTE:
Make sure the center of the stiffener splice (stiffener ends) is at 10" above the horizontal
seam.
3. Use M10 x 25 flange bolt (1) and M10 flange nuts (3) to secure the stiffener splice to the stiffeners.
NOTE:
Install the flange bolts (1) with bolt head on the inside of the bin.
Figure 6-2
Stiffener splice location
1
M10 x 25 flange bolt with HDPE sealing washer (S-10779)
32
Short splice
3
M10 flange nut (S-10784)
33
Long splice
29
Top stiffener
34
Horizontal seam in bin sidewall
31
Bottom stiffener
PNEG-5490D-2X
90' Diameter EVO-50 Beam 2X Bin
55
Summary of Contents for EVO-50
Page 6: ...NOTES 6 PNEG 5490D 2X 90 Diameter EVO 50 Beam 2X Bin ...
Page 34: ...NOTES 34 PNEG 5490D 2X 90 Diameter EVO 50 Beam 2X Bin ...
Page 130: ...NOTES 130 PNEG 5490D 2X 90 Diameter EVO 50 Beam 2X Bin ...
Page 188: ...NOTES 188 PNEG 5490D 2X 90 Diameter EVO 50 Beam 2X Bin ...
Page 220: ...NOTES 220 PNEG 5490D 2X 90 Diameter EVO 50 Beam 2X Bin ...