Chapter 4: Assembling the Sidewall Sheets
Caulking and Assembling the Double Laminated Sheets
Each outer sidewall sheet (1O) must be layered and caulked prior to assembling sidewall sheet seams
together.
The inner sidewall sheets (1I) do not have any caulking.
1. Apply a vertical strip of caulk (2) between the outside edge of the outer sheet (1O) and first row of
holes and another vertical strip (2) between the first and second row of holes.
2. Apply a horizontal strip of caulk (3) between the edge of the sheet and first horizontal seam hole.
3. Apply a strip of caulking (4) around the stiffener holes on the outer sheet (1O).
4. Apply a horizontal strip of caulk (5) between the overlapping vertical seam edge and first horizontal
seam hole at both the sides of the outer sheet (1O).
NOTE:
Always assemble the sidewall sheets with the overlap in the same direction.
Figure 4-8
Caulking between double laminated sidewall sheets
1I
Inner sidewall sheet
3
1/8" x 1/4" caulking strip (horizontal) (S-4458)
(For 14-10 gauge laminates: 13")
(For 9-5 gauge laminates: 18")
1O Outer sidewall sheet
4
1/8" x 1-1/4" caulking strip (stiffener hole) (S-10716)
2
1/8" x 1/4" caulking strip (vertical)
(S-4458)
5
1/8" x 1-1/4" caulking strip (horizontal) (S-10716)
(For 14-10 gauge laminates: 7.5" to 13")
(For 9-5 gauge laminates: 10" to 18")
44
PNEG-5490D-2X
90' Diameter EVO-50 Beam 2X Bin
Summary of Contents for EVO-50
Page 6: ...NOTES 6 PNEG 5490D 2X 90 Diameter EVO 50 Beam 2X Bin ...
Page 34: ...NOTES 34 PNEG 5490D 2X 90 Diameter EVO 50 Beam 2X Bin ...
Page 130: ...NOTES 130 PNEG 5490D 2X 90 Diameter EVO 50 Beam 2X Bin ...
Page 188: ...NOTES 188 PNEG 5490D 2X 90 Diameter EVO 50 Beam 2X Bin ...
Page 220: ...NOTES 220 PNEG 5490D 2X 90 Diameter EVO 50 Beam 2X Bin ...