Stiffener Starting Location
1. All stiffeners should be installed on the exterior of the bin.
2. Install the top stiffener (29) to the top sidewall sheet (30) at a distance of 4" from the top hole in the
bin wall.
3. Use M10 x 25 flange bolt (1) with neoprene washer and M10 flange nuts (3) to secure the
top stiffener (29) to the sidewall sheet (30).
NOTE:
Install the flange bolts (1) with bolt head on the inside of the bin.
Figure 6-1
Top stiffener starting location
1
M10 x 25 flange bolt with HDPE sealing washer (S-10779)
29
Top stiffener
3
M10 flange nut (S-10784)
30
Sidewall sheet
54
PNEG-5490D-2X
90' Diameter EVO-50 Beam 2X Bin
Summary of Contents for EVO-50
Page 6: ...NOTES 6 PNEG 5490D 2X 90 Diameter EVO 50 Beam 2X Bin ...
Page 34: ...NOTES 34 PNEG 5490D 2X 90 Diameter EVO 50 Beam 2X Bin ...
Page 130: ...NOTES 130 PNEG 5490D 2X 90 Diameter EVO 50 Beam 2X Bin ...
Page 188: ...NOTES 188 PNEG 5490D 2X 90 Diameter EVO 50 Beam 2X Bin ...
Page 220: ...NOTES 220 PNEG 5490D 2X 90 Diameter EVO 50 Beam 2X Bin ...