2. Install the remaining three center collar channel brackets (120) between the inner center collar (119)
and outer center collar (45) using 1/2" x 1-3/4" flange bolt (5) and 1/2" flange nut (17).
Figure 8-37
Installing the remaining inner center collar brackets
5
1/2" x 1-3/4" flange bolt (S-10252)
119
Inner center collar (CTR-1581-BS)
17
1/2" flange nut (S-10253)
120
Center collar channel bracket (CTR-1580)
45
Outer center collar (CTR-2224-BS)
3. Tighten all the hardware to the recommended specifications. See
Bolt Torque Specifications, page
PNEG-5490D-2X
90' Diameter EVO-50 Beam 2X Bin