
Assembling the Purlin Number 3............................................................................................... 153
Assembling the Purlin Number 2............................................................................................... 155
Assembling the Purlin Number 1............................................................................................... 157
Installing the Roof Panel Support Clips ..................................................................................... 159
Assembling the Outer Center Collar.......................................................................................... 160
Assembling the Lower Stand-Off Bracket to the Outer Center Collar............................................ 161
Center Collar Placement .......................................................................................................... 162
Guidelines for Assembling and Lifting the A-Frame Rafter Sections............................................. 163
Attaching the A-Frame to the Center Collar ............................................................................... 165
Attaching the A-Frame to the Eave Bracket ............................................................................... 166
Assembling the Roof Panel Clips.............................................................................................. 167
Installing the Intermediate Purlins ............................................................................................ 168
Attaching the Roof Panels........................................................................................................ 169
Installing the Roof Flashing ...................................................................................................... 175
Assembling the Center Collar Brackets to the Inner Center Collar ............................................... 177
Installing the Inner Center Collar to the Outer Center Collar ........................................................ 178
Installing the Top Panels .......................................................................................................... 180
Installing the Upper Stand-Off Support Brackets ........................................................................ 184
Installing the Center Cap Plate ................................................................................................. 185
Installing the Flashing Lock ...................................................................................................... 187
Installing the Roof Ladder Steps ............................................................................................... 190
Roof Ring Placement (Optional) ............................................................................................... 192
Installing the Roof Ring............................................................................................................ 193
Installation of the Peak–To–Exhauster Ladder Kit ...................................................................... 195
Preparation for the Roof Exhauster Installation .......................................................................... 197
Assembling the Roof Exhauster................................................................................................ 199
Installing the Roof Exhauster Assembly .................................................................................... 200
Installing the Manway Cover .................................................................................................... 203
Assembling the Inside Ladder .................................................................................................. 205
Installing the Inside Ladder ...................................................................................................... 206
Installing the Inside Ladder Bottom Bracket ............................................................................... 209
Guidelines for Installing a Sidedraw System .............................................................................. 210
Locating the Chutes................................................................................................................. 212
Locating the Discharge Opening............................................................................................... 213
Sidewall Overlap for Sidedraw Weldment.................................................................................. 214
Caulking for the Sidedraw Weldment ........................................................................................ 215
Wind Ring Quantities ............................................................................................................... 216
Installing the Wind Rings.......................................................................................................... 217
Assembling the Weather Cover for Roller Valve ......................................................................... 219
PNEG-5490D-2X
90' Diameter EVO-50 Beam 2X Bin
5
Summary of Contents for EVO-50
Page 6: ...NOTES 6 PNEG 5490D 2X 90 Diameter EVO 50 Beam 2X Bin ...
Page 34: ...NOTES 34 PNEG 5490D 2X 90 Diameter EVO 50 Beam 2X Bin ...
Page 130: ...NOTES 130 PNEG 5490D 2X 90 Diameter EVO 50 Beam 2X Bin ...
Page 188: ...NOTES 188 PNEG 5490D 2X 90 Diameter EVO 50 Beam 2X Bin ...
Page 220: ...NOTES 220 PNEG 5490D 2X 90 Diameter EVO 50 Beam 2X Bin ...