Installing the Upper Stand-Off Support Brackets
Eight upper stand-off support brackets are attached to the top panels and allow support for a conveyor or
catwalk system.
1. Locate the eight sets of four holes in the top panels (121), and place a gasket (123) over each set of
eight holes, where the upper stand-off support brackets (112) will be installed.
2. Position one upper stand-off bracket (112) over each gasket (123) and align the holes.
3. Install 3/8" x 1-1/2" flange bolts (1) and 3/8" flange nuts (15) to secure the upper stand-off support
brackets (112), gaskets (123) and lower stand-off support brackets (111) together with the top
panels (121).
NOTE:
Make sure the end lines in the stand-off brackets (111 and 112) are vertical.
Figure 8-42
Installing the upper stand-off support brackets
1
3/8" x 1-1/2" flange bolt with sealing washer (S-7488)
112
Upper stand-off support bracket
(CTR-1559-BS)
15
3/8" flange nut (S-9426)
121
Top panel (CTR-1585)
111
Lower stand-off support bracket (CTR-1559-BS)
123
Gasket (S-10378)
4. Tighten all the hardware to the recommended torque specifications. See
184
PNEG-5490D-2X
90' Diameter EVO-50 Beam 2X Bin
Summary of Contents for EVO-50
Page 6: ...NOTES 6 PNEG 5490D 2X 90 Diameter EVO 50 Beam 2X Bin ...
Page 34: ...NOTES 34 PNEG 5490D 2X 90 Diameter EVO 50 Beam 2X Bin ...
Page 130: ...NOTES 130 PNEG 5490D 2X 90 Diameter EVO 50 Beam 2X Bin ...
Page 188: ...NOTES 188 PNEG 5490D 2X 90 Diameter EVO 50 Beam 2X Bin ...
Page 220: ...NOTES 220 PNEG 5490D 2X 90 Diameter EVO 50 Beam 2X Bin ...