
3. Install a quick link (130) to each temperature cable assembly (44) to support the temperature
cables.
IMPORTANT:
Do not attach weights to the temperature cables; secure the bottom of cables to the
floor with light twine. No roof rafter shall support more than one cable.
Figure 8-10
Installing the supplier quick link to the temperature cable bracket
44
Temperature cable assembly (CRP-6166)
130
Supplier quick link
128
Roof rafter
4. Locate the center collar (45) temperature cable hole (131) and install a supplier quick link (130),
allowing for the installation of a temperature cable at this location.
Figure 8-11
Installing the supplier quick link to the center collar (view from bottom side of center collar)
45
Outer center collar (CTR-2224-BS)
131
Temperature cable hole
130
Supplier quick link
PNEG-5490D-2X
90' Diameter EVO-50 Beam 2X Bin
143
Summary of Contents for EVO-50
Page 6: ...NOTES 6 PNEG 5490D 2X 90 Diameter EVO 50 Beam 2X Bin ...
Page 34: ...NOTES 34 PNEG 5490D 2X 90 Diameter EVO 50 Beam 2X Bin ...
Page 130: ...NOTES 130 PNEG 5490D 2X 90 Diameter EVO 50 Beam 2X Bin ...
Page 188: ...NOTES 188 PNEG 5490D 2X 90 Diameter EVO 50 Beam 2X Bin ...
Page 220: ...NOTES 220 PNEG 5490D 2X 90 Diameter EVO 50 Beam 2X Bin ...